LG DLEX9500K Owners Manual - Page 31
Installation Test Duct Check
View all LG DLEX9500K manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 31 highlights
ENGLISH INSTALLATION 31 Installation Test (Duct Check) Once you have completed the installation of the dryer, use this test to make sure the condition of the exhaust system is adequate for proper operation of the dryer. This test should be performed to alert you to any serious problems in the exhaust system of your home. • Your dryer features Flow SenseTM, an innovative sensing system that automatically detects blockages and restrictions in dryer ductwork. Keeping ductwork clean of lint buildup and free of restrictions allows clothes to dry faster and reduces energy use. NOTE The dryer should be cool before starting this test. If the dryer was warmed up during installation, run the AIR DRY cycle for a few minutes to reduce the interior temperature. To activate the Installation test: 1. Remove the drying literature, and then close the door. Do not load anything in the drum for this test, as it may affect the accuracy of the results. 4. Check the display for results. During the test cycle, monitor the Flow SenseTM display on the control panel. If the Flow Sense indicator text lights up, the exhaust system is restricted. If the indicator text remains dark, the exhaust system is adequate. Other problems may also be shown with error codes. Refer to the next page for error code details and solutions. DARK: OK LIGHTED: RESTRICTED Have the system checked immediately, as performance will be poor. 5. End of cycle. At the end of the test cycle, will display. The test cycle will end and the dryer will shut off automatically after a short delay. 2. A fter you are pressed of Power button, you will press and hold the Temp. and Signal buttons in 0.5 seconds. This button sequence activates the installation test. The code will display if the activation is successful. 3. Press and hold the Start button. The dryer will start the test, which will last about two minutes. The heat will be turned on and the temperatures in the drum will be measured.