LiftMaster LA412UL Installation Manual - Page 15
Large Metal Control Box XLSOLARCONTUL, Wall or Column Mount, Post Mount, TYPE AND SIZE
View all LiftMaster LA412UL manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 15 highlights
INSTALLATION Large Metal Control Box (XLSOLARCONTUL) The control box MUST be mounted within 5 feet (1.52 m) of the gate operator. Mount the control box as high as possible for best radio reception. Make sure the control box is level. Wall or Column Mount 1. Open the control box. The control box door may be removed by opening the door 90°. Lift the door from the hinges and set aside until the installation is complete. 2. Use knock outs located at the 4 corners of the control box and knock out using a screwdriver and hammer. 3. Secure the control box to mounting surface using the provided screws (4). Post Mount NOTE: The post mount option is not recommended for the 33AH battery application. 1. Open the control box. The control box door may be removed by opening the door 90°. Lift the door from the hinges and set aside until the installation is complete. 2. The control box can be mounted to a post with 'U' bolts (refer to chart). The knock out will accommodate a 3/8" diameter 'U' bolt. Select center mounting holes (top and bottom) and knock out using a screwdriver and hammer. 3. Secure the control box to mounting surface with U-bolts and rubber washers (not provided) to ensure a watertight seal. TYPE AND SIZE Standard 3" Round Pipe Standard 4" Square Post Standard 6" Square Post 'U' BOLT OPENING 3-1/2" 4" 6" 15