INSTALLATION » SITE PREPARATION + TYPES OF INSTALLATIONS SITE PREPARATION BEFORE installing the operator, be sure to check the following: • Gate is constructed and installed according to ASTM F2200 standards • Gate fits specifications of operator • National and local building codes • Earth ground rod • UL approved conduit for low and high voltage • Mounting considerations post or pad • Operator placement SAFETY CONSIDERATIONS: • Warning signs • Entrapment devices such as loops, contact sensors and non-contact sensors Outside Property SAFETY CATCH ROLLERS 1 Install catch rollers with safety covers on the side of a post or wall with a minimal distance of half an inch between the rollers and gate. 1 2 DO NOT use a gate catch post. Because the coasting distance may vary due to changes in temperature, it is 1/2" NOT recommended to install a stop or catch post in front of the gates path. To do so will cause the gate to hit the post in certain instances. Inside LSoaofepty Inside Property 2 1/2" TYPES OF INSTALLATIONS STANDARD INSTALLATION The illustration is an example of a standard installation. Gate Rail Stop Gate Rail Stop REAR INSTALLATION The illustration is an example of a rear installation. Gate Rail Stop 9 Gate Rail Stop

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

1/2"
1/2"
SAFETY CATCH ROLLERS
Install catch rollers with safety covers on the side of a post or wall with a
minimal distance of half an inch between the rollers and gate.
DO NOT use a gate catch post.
Because the coasting distance may vary due to changes in temperature, it is
NOT recommended to install a stop or catch post in front of the gates path.
To do so will cause the gate to hit the post in certain instances.
1
2
2
1
Outside Property
Inside Property
Inside Safety
Loop
Gate Rail Stop
Gate Rail Stop
Gate Rail Stop
Gate Rail Stop
SITE PREPARATION
BEFORE
installing the operator, be sure to check the following:
Gate is constructed and installed according to ASTM F2200 standards
• Gate fits specifications of operator
• National and local building codes
• Earth ground rod
UL approved conduit for low and high voltage
• Mounting considerations post or pad
• Operator placement
SAFETY CONSIDERATIONS:
• Warning signs
Entrapment devices such as loops, contact sensors and non-contact sensors
INSTALLATION
» SITE PREPARATION + TYPES OF INSTALLATIONS
REAR INSTALLATION
The illustration is an example of a rear installation.
TYPES OF INSTALLATIONS
STANDARD INSTALLATION
The illustration is an example of a standard installation.