LiftMaster T T MECHANICAL Manual - Page 4

Installation, Important Note, Mount Header Bracket, Mount Operator - rail

Page 4 highlights

INSTALLATION INSTRUCTIONS IMPORTANT NOTE: Before the operator is installed, be sure the door has been properly aligned and is working smoothly. Although each installation will vary due to particular building characteristics, refer to the following general procedures to install the operator. MOUNT HEADER BRACKET The trolley operator is generally mounted over the center of the door. However, off center mounting may be required due to interfering structures or location of door stile / top section support. In such cases, the operator may be mounted up to 24" off center on torsion spring doors. Extension springs require center mounting. 1. Locate the center of the door and mark a line on the wall directly above the door. Extend this line up the wall. 2. Determine the highest point of door travel. Slowly raise the door and observe the action of the top section. When the top section reaches its highest point, use a level and project a line from this point to the center line the of the door. Carpenter's Header Level Wall High Arc Point Door Travel Projection 3. Using the projected lines for location, mount a suitable wood block or length of angle iron to the wall above the door opening. Refer to the illustration below. This will provide a mounting pad for the front header bracket of the operator. If necessary reinforce the wall with suitable mounting brackets to ensure adequate support of mounting pad. Using suitable hardware, mount the (U shaped) front header bracket to the pad. 3.50" 1.75" 4" MIN. High Rise Point Projection Line MOUNT OPERATOR 1. Allowing the motor to rest on the floor, raise the front end of the track assembly to the front header bracket and fasten using the 3/8"dia. x 6.40" long pivot shaft and cotterpins supplied. Header Attachment Cotterpins Pivot shaft 2. Swing the operator to a horizontal position above the guide rails and temporarily secure with a suitable rope, chain, or support from the floor. Now open garage door slowly, being careful not to dislodge the temporary support. Using the door as a support, place a level against the rail and shim the operator until it is horizontal. Make sure that the operator is aligned with the center line of the door. Guide Rails Using the Door as support, shim operator to a horizontal position. OF DOOR Header Bracket Drill Pattern 4 Operator Alignment

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20

4
Carpenter's
Level
Header
Wall
High Arc
Point
IMPORTANT NOTE:
Before the operator is installed, be sure the door has been properly aligned and is working
smoothly.
Although each installation will vary due to particular building characteristics, refer to the following
general procedures to install the operator.
MOUNT HEADER BRACKET
The trolley operator is generally mounted over the
center of the door.
However, off center mounting
may be required due to interfering structures or
location of door stile / top section support.
In such
cases, the operator may be mounted up to 24” off
center on torsion spring doors.
Extension springs
require center mounting.
1.
Locate the center of the door and mark a line on
the wall directly above the door.
Extend this line up
the wall.
2.
Determine the highest point of door travel.
Slowly raise the door and observe the action of the
top section.
When the top section reaches its highest
point, use a level
and project a line from this point to
the center line the of the door.
MOUNT OPERATOR
1.
Allowing the motor to rest on the floor,
raise the
front end of the track assembly to the front header
bracket and fasten using the 3/8”dia. x 6.40” long
pivot shaft and cotterpins supplied.
3.
Using the projected lines for location, mount a
suitable wood block or length of angle iron to the wall
above the door opening.
Refer to the illustration
below.
This will provide a mounting pad for the front
header bracket of the operator.
If necessary
reinforce the wall with suitable mounting brackets to
ensure adequate support of mounting pad.
Using
suitable hardware, mount the (U shaped) front header
bracket to the pad.
Header Bracket Drill Pattern
2.
Swing the operator to a horizontal position above
the guide rails and temporarily secure with a suitable
rope, chain, or support from the floor.
Now open
garage door slowly, being careful not to dislodge the
temporary support.
Using the door as a support,
place a level against the rail and shim the operator
until it is horizontal.
Make sure that the operator is
aligned with the center line of the door.
Door Travel
Projection
INSTALLATION
INSTRUCTIONS
Header Attachment
Pivot shaft
Cotterpins
Using the Door as support, shim
operator to a horizontal position.
Guide
Rails
Operator Alignment
OF DOOR
3.50”
1.75”
4” MIN.
High Rise Point
Projection Line