Netgear GS724TR GS748TR Hardware manual - Page 21

Installation, Step 1: Preparing the Site

Page 21 highlights

Chapter 4 Installation This chapter describes the installation procedures for your NETGEAR Smart Switch. Switch installation involves the following steps: Step 1: Preparing the Site Step 2: Installing the Switch Step 3: Checking the Installation Step 4: Connecting Devices to the Switch Step 5: Installing an SFP GBIC Module Step 6: Applying AC Power Step 7: Managing the Switch using a Web Browser or the PC Utility Step 1: Preparing the Site Before you installing the switch, ensure the operating environment meets the operating environment requirements in the following table. Table 4-1. Site Requirements Characteristics Requirements Mounting Access • Desktop installations - Provide a flat table or shelf surface. • Rack-mount installations - Use a 17-inch (48.3-centimeter) EIA standard equipment rack that is grounded and physically secure. The rack-mount kit supplied with the switch is also required. Locate the switch in a position that allows access to the front panel RJ-45 ports, view the front panel LEDs, and access power connector. v1.0, December 2007 4-13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41

4-13
v1.0, December 2007
Chapter 4
Installation
This chapter describes the installation procedures for your NETGEAR Smart Switch. Switch
installation involves the following steps:
Step 1: Preparing the Site
Step 2: Installing the Switch
Step 3: Checking the Installation
Step 4: Connecting Devices to the Switch
Step 5: Installing an SFP GBIC Module
Step 6: Applying AC Power
Step 7: Managing the Switch using a Web Browser or the PC Utility
Step 1: Preparing the Site
Before you installing the switch, ensure the operating environment meets the operating
environment requirements in the following table.
Table 4-1.
Site Requirements
Characteristics
Requirements
Mounting
Desktop installations
- Provide a flat table or shelf surface.
Rack-mount installations
- Use a 17-inch (48.3-centimeter) EIA standard equipment
rack that is grounded and physically secure. The rack-mount kit supplied with the switch
is also required.
Access
Locate the switch in a position that allows access to the front panel RJ-45 ports, view the
front panel LEDs, and access power connector.