Netgear RN10211D Hardware Manual - Page 70
Power On and Shut Down, Power On, Preferred Shutdown
View all Netgear RN10211D manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 70 highlights
ReadyNAS OS 6 Desktop Storage Systems Power On and Shut Down This section describes how to power on and shut down your system. If you need to shut down the system, use the preferred shutdown method whenever possible. Power On When the system is connected to a power supply and the Power switch is in the On position, the system automatically powers on. When connected to a host that is powered on, the EDA 500 automatically powers on. The EDA 500 detects a powered-on host through the eSATA link. You can also power on the system by pressing the Power button on the front panel of the system. Preferred Shutdown If possible, always unmount the EDA 500 volumes from the host before shutting down the EDA 500. Use the ReadyNAS local admin page to gracefully shut down the EDA 500. For information about how to gracefully shut down the EDA 500 using the ReadyNAS local admin page, see the ReadyNAS OS 6 Software Manual, which is available at http://support.netgear.com/product/ReadyNAS-OS6. Forced Shutdown Perform a forced shutdown only if the storage system is not responding. To perform a forced shutdown: Flip the Power switch on the back panel of the system to the Off position. NETGEAR EDA 500 70