Optoma UHZ65LV UHZ65LV UM - Page 16
Projector installation notice
View all Optoma UHZ65LV manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
SETUP AND INSTALLATION Projector installation notice Allow at least 30 cm clearance around the exhaust vent. Minimum 100mm (3.94 inches) Minimum 300mm (11.81 inches) Minimum 300mm (11.81 inches) Minimum 100mm (3.94 inches) Minimum 100mm (3.94 inches) Minimum 100mm (3.94 inches) Ensure that the intake vents do not recycle hot air from the exhaust vent. When operating the projector in an enclosed space, ensure that the surrounding air temperature within the enclosure does not exceed operation temperature while the projector is running, and the air intake and exhaust vents are unobstructed. All enclosures should pass a certified thermal evaluation to ensure that the projector does not recycle exhaust air, as this may cause the device to shutdown even if the enclosure temperature is with the acceptable operation temperature range. 16 English