Panasonic fv08vsl1 Installation Instructions - Page 12

Installing

Page 12 highlights

INSTALLATION V ( WOODEN HEADER ) CONTINUED 4. Follow step 5 to 11 of installation I (page 7-page 8) to complete the installation work. Junction box Circular duct a,s a 6 Long screws (ST4.2X20) Conduit Junction box 0 Wire nut Lead wires Green wires Fig.21 INSTALLATION VI ( IN EXISTING CONSTRUCTION ) 1. Installation in existing construction. Installing the fan body in an existing building requires an accessible area (attic or crawl space) above the planning installation location or existing ducting and wiring. (1) To install the fan body, follow the procedures described in Installation II. Take the following precautions before installation. CAUTION: Check area above planning installation location to be sure that: 1. Duct work can be done and that area is sufficient for proper ventilation. 2. Wiring can be run to planning location. 3. No wiring or other obstructions shall interfere with installation. (2) Inspect duct work and wiring before proceeding with installation. (3) Plan suitable location for fan body. (next to ceiling joist) (4) Before installation, provide inspection and maintenance access at a location that will not interfere with installation work shown in installation II. (5) First, remove ceiling section according to Fig.6 of page 8. (6) Install fan body. 2. Installation from accessible area above fan location. (1) Inspect duct work and wiring before proceeding with installation. (2) Remove ceiling section according to Fig.6 of page 8. (3) Install fan body. 12

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14

INSTALLATION
V
(
WOODEN
HEADER
)
CONTINUED
4.
Follow
step
5
to
11
of
installation
I
(page
7
-page
8)
to
complete
the
installation
work.
Junction
box
,
as
a
6
Long
screws
(ST4.2X20)
Conduit
Junction
box
Lead
wires
0
Green
wires
Circular
duct
Wire
nut
Fig.21
INSTALLATION
VI
(
IN
EXISTING
CONSTRUCTION
)
1.
Installation
in
existing
construction.
Installing
the
fan
body
in
an
existing
building
requires
an
accessible
area
(attic
or
crawl
space)
above
the
planning
installation
location
or
existing
ducting
and
wiring.
(1)
To
install
the
fan
body,
follow
the
procedures
described
in
Installation
II
.
Take
the
following
precautions
before
installation.
CAUTION:
Check
area
above
planning
installation
location
to
be
sure
that:
1.
Duct
work
can
be
done
and
that
area
is
sufficient
for
proper
ventilation.
2.
Wiring
can
be
run
to
planning
location.
3.
No
wiring
or
other
obstructions
shall
interfere
with
installation.
(2)
Inspect
duct
work
and
wiring
before
proceeding
with
installation.
(3)
Plan
suitable
location
for
fan
body.
(next
to
ceiling
joist)
(4)
Before
installation,
provide
inspection
and
maintenance
access
at
a
location
that
will
not
interfere
with
installation
work
shown
in
installation
II
.
(5)
First,
remove
ceiling
section
according
to
Fig.6
of
page
8.
(6)
Install
fan
body.
2.
Installation
from
accessible
area
above
fan
location.
(1)
Inspect
duct
work
and
wiring
before
proceeding
with
installation.
(2)
Remove
ceiling
section
according
to
Fig.6
of
page
8.
(3)
Install
fan
body.
12