Pentair iChlor Salt Chlorine Generator iChlorManual - Page 19

Installation - system manual

Page 19 highlights

15 INSTALLATION This section describes how to install the iChlor® SCG into the pool plumbing system. Also, included are connection instructions for IntelliTouch®, EasyTouch® and SunTouch® Control Systems. Before installing, review the iChlor kit contents and required tools. Note: For Power Center installation instructions, see the "Power Center Installation Guide" (P/N 520590). Note: Salt is not provided. For details about the type of salt to use, see "What Type of Salt to Use," on page 11. Note: A TIME CLOCK must be wired to the load side if the iChlor SCG is used in "stand alone" mode without an automation control system. Kit Contents • One iChlor SCG cell • Two (2) cell unions with two (2) o-rings • One iChlor adapter (to retrofit on existing iChlor SCG installations). • Installation and User's Guide (this manual) • Cut-out template Required Tools • Tape measure • Phillips and flathead screwdriver • Pliers • Hacksaw • An NSF approved all purpose PVC/CPVC/ABS cleaner primer • An NSF approved all purpose PVC/CPVC/ABS cement RISK OF ELECTRIC SHOCK, WHICH CAN RESULT IN SERIOUS INJURY OR DEATH. Before attempting installation or service, ensure that all power to the circuit supplying power to the system is disconnected/turned off at the circuit breaker. It is recommended, but not mandatory that the iChlor Power Center be connected to a circuit protected by a ground fault circuit-interrupter (GFCI). When using electrical products, basic precautions should always be followed, including the following: • Grounding (earth bonding) is required. The unit should be installed by a qualified service person and grounded. • Install to allow access to cell buttons and power center. • Read Safety Precautions and Important Instructions (page i and ii). Before attempting any electrical wiring, be sure to read and follow Safety Instructions. Wiring should only be performed by a qualified professional. • Install the iChlor unit a minimum of three (3) feet away from the heater outlet. • Pipe couplings: Schedule 80, maximum pressure 50 psi at 70° F (21° C). • Operate unit with minimum flow of 20 gpm. For high flow applications (higher than 80 gpm), use a bypass loop (see page 5) for best flow sensing. • Provide at least 12"-18" of straight pipe in front of the cell inlet. iCHLOR® Salt Chlorine Generator Installation and User's Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40

15
iCHLOR® Salt Chlorine Generator Installation and User’s Guide
INSTALLATION
This section describes how to install the iChlor
®
SCG into the pool plumbing system. Also, included are connection
instructions for IntelliTouch
®
, EasyTouch
®
and SunTouch
®
Control Systems. Before installing, review the iChlor kit
contents and required tools.
Note:
For Power Center installation instructions, see the “Power Center Installation Guide” (P/N 520590).
Note:
Salt is not provided. For details about the type of salt to use, see “What Type of Salt to Use,” on page 11.
Kit Contents
One iChlor SCG cell
Two (2) cell unions with two (2) o-rings
One iChlor adapter (to retrofit on existing iChlor SCG installations).
Installation and User’s Guide (this manual)
Cut-out template
Required Tools
Tape measure
Phillips and flathead screwdriver
Pliers
Hacksaw
An NSF approved all purpose PVC/CPVC/ABS cleaner primer
An NSF approved all purpose PVC/CPVC/ABS cement
Grounding (earth bonding) is required. The unit should be installed by a qualified service person and grounded.
Install to allow access to cell buttons and power center.
Read Safety Precautions and Important Instructions (page i and ii). Before attempting any electrical
wiring, be sure to read and follow Safety Instructions. Wiring should only be performed by a qualified
professional.
Install the iChlor unit a minimum of three (3) feet away from the heater outlet.
• Pipe couplings: Schedule 80, maximum pressure 50 psi at 70° F (21° C).
Operate unit with minimum flow of 20 gpm. For high flow applications (higher than 80 gpm), use a bypass loop
(see page 5) for best flow sensing.
Provide at least 12”-18” of straight pipe in front of the cell inlet.
RISK OF ELECTRIC SHOCK, WHICH CAN RESULT IN SERIOUS INJURY OR DEATH.
Before attempting installation or service, ensure that all power to the circuit supplying
power
to the system is disconnected/turned off at the circuit breaker. It is recommended, but not
mandatory that the iChlor Power Center be connected to a circuit protected by a ground
fault circuit-interrupter (GFCI).
When using electrical products, basic precautions should
always be followed, including the following:
Note:
A TIME CLOCK must be wired to the load side if the iChlor SCG is used in “stand alone” mode
without an automation control system.