Reebok 825 English Manual - Page 8

Cable Assembly

Page 8 highlights

6. See the inset drawing. Press two Weight Inserts (77) 6 50 1 45 into the indicated holes in each Weight (26). Make sure the large pin groove is oriented as shown. Slide all of the included Weights (26) onto the two Weight Guides (23). Make sure the Weights are oriented correctly. The holes must be turned towards the front of the unit, as shown. Slide the Top Weight (16) with the pre-attached Weight Tube (36) onto the Weight Guides (23). The Weight Tube slides into the hole in the center of the Weights (26). Welded Tubes 23 50 60 3 Place the Top Frame (1) over the Weight Guides (23), so the Weight Guides fit into the welded tubes on the 16 Top Frame. Align the bracket on the Top Frame (1) with the holes in the Main Upright (3). Insert two 3/8Ó x 3Ó Bolts (45) through the holes. Tighten a 3/8Ó Nylon Locknut (50) onto the lower of the two Bolts. Do not mount a Locknut on the upper Bolt yet. Attach the Weight Guides (23) to the Top Frame (1) with two 3/8Ó x 1 3/4Ó Bolts (60) and two 3/8Ó Nylon Locknuts (50). Go back and fully tighten all Nylon Locknuts used in steps 1, 2 and 6. 36 26 Holes Large Pin Groove 77 26 Cable Assembly 7. Locate and open the parts bag labeled ÒCABLE ASSEMBLY.Ó Refer to the Cable Diagram on page 16 as you assemble the Cables. Identify the High Cable (73). It is approximately 188Ó long (the shortest Cable), and it has a ball on one end and a bolt on the other. Locate the end of the High Cable (73) with the bolt. Feed this end through the indicated slot in the Main Upright (3) from below. Feed almost all of the Cable through the slot. Slide a 3/8Ó Flat Washer (55) and a Pulley Bushing (42) onto a 3/8Ó x 2 1/2Ó Bolt (54). 7 Bolt 73 55 63 42 Slot 54 35 42 55 Ball Wrap the High Cable (73) around a 4Ó Pulley (35) and slide both Pulley and Cable into the slot in the Main Upright (3). While holding the Pulley with one hand, 3 insert the 3/8Ó x 2 1/2Ó Bolt (54) through the hole in the Main Upright, through the Pulley and through the other side of the Upright. Slide a Pulley Bushing (42) and a 3/8Ó Flat Washer (55) onto the 3/8Ó x 2 1/2Ó Bolt (54). Then tighten a 3/8Ó Nylon Jamnut (63) onto the Bolt. 8

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25

8
6.
See the inset drawing. Press two Weight Inserts (77)
into the indicated holes in each Weight (26).
Make
sure the large pin groove is oriented as shown.
Slide all of the included Weights (26) onto the two
Weight Guides (23).
Make sure the Weights are ori-
ented correctly. The holes must be turned
towards the front of the unit, as shown.
Slide the Top Weight (16) with the pre-attached
Weight Tube (36) onto the Weight Guides (23). The
Weight Tube slides into the hole in the center of the
Weights (26).
Place the Top Frame (1) over the Weight Guides (23),
so the Weight Guides fit into the welded tubes on the
Top Frame.
Align the bracket on the Top Frame (1) with the holes
in the Main Upright (3). Insert two 3/8± x 3± Bolts (45)
through the holes. Tighten a 3/8± Nylon Locknut (50)
onto the lower of the two Bolts.
Do not mount a
Locknut on the upper Bolt yet.
Attach the Weight Guides (23) to the Top Frame (1)
with two 3/8± x 1 3/4± Bolts (60) and two 3/8± Nylon
Locknuts (50).
Go back and fully tighten all Nylon
Locknuts used in steps 1, 2 and 6.
6
7.
Locate and open the parts bag labeled ±CABLE
ASSEMBLY.² Refer to the Cable Diagram on page
16 as you assemble the Cables.
Identify the High Cable (73). It is approximately 188±
long (the shortest Cable), and it has a ball on one
end and a bolt on the other.
Locate the end of the High Cable (73) with the bolt.
Feed this end through the indicated slot in the Main
Upright (3) from below. Feed almost all of the Cable
through the slot.
Slide a 3/8± Flat Washer (55) and a Pulley Bushing
(42) onto a 3/8± x 2 1/2± Bolt (54).
Wrap the High Cable (73) around a 4± Pulley (35) and
slide both Pulley and Cable into the slot in the Main
Upright (3). While holding the Pulley with one hand,
insert the 3/8± x 2 1/2± Bolt (54) through the hole in
the Main Upright, through the Pulley
and through the
other side of the Upright.
Slide a Pulley Bushing (42) and a 3/8± Flat Washer
(55) onto the 3/8± x 2 1/2± Bolt (54). Then tighten a
3/8± Nylon Jamnut (63) onto the Bolt.
7
Cable Assembly
Ball
Bolt
Slot
35
73
55
54
42
55
3
42
63
45
1
60
50
50
23
16
36
26
Welded
Tubes
Holes
3
77
26
Large Pin
Groove