Reebok Trainer Rx 4.0 Bike English Manual - Page 8

Tip: Tighten the two Patch

Page 8 highlights

6. Attach the Seat (9) to the Seat Carriage (41) with four M6 x 16mm Patch Screws (71) and 6 four M6 Washers (88). Note: Only two Patch 9 Screws and two Washers are shown. 41 88 71 7. Have another person hold the Upright (2) near the Frame (1). See the inset drawing. Locate the wire tie in the Upright (2). Tie the lower end of the wire tie to the Main Wire Harness (43) and to the Upper Pulse Wire (42). Next, pull the upper end of the wire tie upward out of the top of the Upright. Then, untie and discard the wire tie. Tip: Do not allow the ends of the wires to fall into the Upright. Use a piece of tape or an elastic band to hold the wires in place until step 9. Tip: Avoid pinching the wires. Attach the Upright (2) to the Frame (1) with four M8 x 18mm Patch Screws (67) and four M8 Split Washers (93). Tip: Tighten the two Patch Screws in the front of the Upright and then tighten the other two Patch Screws. 7 42 43 67 93 Wire Tie 43 42 Avoid pinching the wires 2 93 67 93 93 67 1 8. Identify the Right Handlebar (20), which is marked with a "Right" sticker, and orient it as 8 shown. Attach the Right Handlebar (20) to the Upright (2) with two M8 x 18mm Patch Screws (67) and two M8 Split Washers (93). Attach the Left Handlebar (7) in the same way. 7 2 93 67 20 8

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24

8
6.
Attach the Seat (9) to the Seat Carriage (41)
with four M6 x 16mm Patch Screws (71) and
four M6 Washers (88). Note: Only two Patch
Screws and two Washers are shown.
6
41
9
71
8.
Identify the Right Handlebar (20), which is
marked with a “Right” sticker, and orient it as
shown.
Attach the Right Handlebar (20) to the Upright
(2) with two M8 x 18mm Patch Screws (67) and
two M8 Split Washers (93).
Attach the Left Handlebar (7) in the same
way.
7
93
20
2
8
67
7.
Have another person hold the Upright (2) near
the Frame (1).
See the inset drawing.
Locate the wire tie in
the Upright (2). Tie the lower end of the wire tie
to the Main Wire Harness (43) and to the Upper
Pulse Wire (42). Next, pull the upper end of the
wire tie upward out of the top of the Upright.
Then, untie and discard the wire tie.
Tip: Do
not allow the ends of the wires to fall into
the Upright. Use a piece of tape or an elastic
band to hold the wires in place until step 9.
Tip: Avoid pinching the wires.
Attach the
Upright (2) to the Frame (1) with four M8 x
18mm Patch Screws (67) and four M8 Split
Washers (93).
Tip: Tighten the two Patch
Screws in the front of the Upright and then
tighten the other two Patch Screws.
7
2
67
67
67
1
93
93
93
93
43
42
Avoid pinching
the wires
42
43
Wire
Tie
88