Samsung RF28R7551SR/AA User Manual - Page 49
Provision for Open Access to the Connected Product Requirements
View all Samsung RF28R7551SR/AA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 49 highlights
Provision for Open Access to the Connected Product Requirements 1. SGIP Open Standards (Smart Energy Profile 2.0 - http://www.csep.org/) - Energy Consumption Reporting - Demand Response 2. Samsung OPEN API - Operational Status, User Settings & Messages - ICE Maker Status: GET /icemaker/status/vs/0 - Door Open Alarm: GET /doors/vs/0 - DR Status: GET /drlc/vs/0 - Delay Defrost Capability - Set Schedule of the Defrost Delay: POST /defrost/reservation/vs/0?op=add - Get Schedule of the Defrost Delay : GET /defrost/reservation/vs/0 - Delete Schedule of the Defrost Delay: POST /defrost/reservation/vs/0?op=remove - Defrost Delay On/OFF: POST /defrost/delay/vs/0 Operations Untitled-5 49 English 49 2020-03-31 12:26:25
English
49
Operations
Provision for Open Access to the Connected Product Requirements
1.
SGIP Open Standards (Smart Energy Profile 2.0 - http://www.csep.org/)
- Energy Consumption Reporting
- Demand Response
2.
Samsung OPEN API
- Operational Status, User Settings & Messages
- ICE Maker Status: GET /icemaker/status/vs/0
- Door Open Alarm: GET /doors/vs/0
- DR Status: GET /drlc/vs/0
- Delay Defrost Capability
- Set Schedule of the Defrost Delay: POST /defrost/reservation/vs/0?op=add
- Get Schedule of the Defrost Delay : GET /defrost/reservation/vs/0
- Delete Schedule of the Defrost Delay: POST /defrost/reservation/vs/0?op=remove
- Defrost Delay On/OFF: POST /defrost/delay/vs/0
Untitled-5
49
2020-03-31
°° 12:26:25