Sharp PN-C703B Operation Manual - Page 38
Mounting Precautions, For SHARP dealers and service engineers
![]() |
View all Sharp PN-C703B manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 38 highlights
Mounting Precautions (For SHARP dealers and service engineers) • When installing, removing or moving the monitor, ensure that this is carried out by at least 3 people. • Be sure to use a wall-mount bracket designed or designated for mounting the monitor. • This monitor is designed to be installed on a concrete wall or pillar. Reinforced work might be necessary for some materials such as plaster / thin plastic board / wood before starting installation. This monitor and bracket must be installed on a wall which can endure at least 4 times or more the weight of the monitor. Install by the most suitable method for the material and the structure. • To attach a VESA-compliant mounting bracket, use M6 screws that are 5/16 inch (8 mm) to 3/8 inch (10 mm) longer than the thickness of the mounting bracket. 5/16 - 3/8 inch (8-10 mm) Screws (M6) Bracket The monitor mounting • Do not use an impact driver. • After mounting, please carefully ensure the monitor is secure, and not able to come loose from the wall or mount. • Do not use any screw holes other than VESA holes for installation. nAttaching the Tray Secure the tray using 5 tray mounting screws (M3) (supplied). E 38
![](/manual_guide/products/sharp-pnc703b-operation-manual-dd5a8be/38.png)