Sub-Zero 700BCI Sub-Zero Design Guide - Page 30
Built-In Refrigeration, Dual Installation
View all Sub-Zero 700BCI manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 30 highlights
Built-In Refrigeration 30 Dual installation-standard application. Dual Installation Panel Requirements MAX WEIGHT PER PANEL BI-36R, BI-36RG and BI-36F All Other Models Dual Wide Grille Panel MIN PANEL THICKNESS Framed Panels Overlay and Flush Inset Panels Dual Installation STANDARD APPLICATION Two overlay or stainless steel units may be placed side by side in a dual installation. Some standard applications will require a dual installation kit, available through your authorized Sub-Zero dealer. If you are installing two units side by side in a flush inset application, refer to page 32. A custom filler strip can be used between two units in a framed, overlay or stainless steel design application. It is recommended that the filler strip be at least 2" (51) wide to prevent condensation between the units. Be sure to add the filler strip width to your rough opening width. Refer to the full-scale template on page 42. Dual installations without a filler strip can only be accomplished using two units with opposite hinges as shown in illustration A below. The dual installations shown in illustrations B and C require a filler strip. IMPORTANT NOTE: For the application shown in illustration A, a dual installation accessory kit is required. Refer to page 36 for information on dual installation kits. 75 lbs (34 kg) 50 lbs (23 kg) 26 lbs (12 kg) 1/4" (6) 5/8" (16) WITHOUT FILLER STRIP FILLER STRIP REQUIRED FILLER STRIP REQUIRED Illus. A Illus. B Illus. C