Sub-Zero 700TFI Integrated Installation Guide - Page 21

Integrated Installation, Installation Checklist - parts

Page 21 highlights

Integrated Installation Installation Checklist To ensure a safe and proper installation, the following checklist should be completed by the installer to ensure that no part of the installation has been overlooked. INSTALLATION CHECKLIST Have all packing materials been removed? Turn the unit on. Is it operating properly? Is the power cord plugged into a properly grounded outlet, which has been installed in accordance with all applicable electrical codes? For units with an automatic ice maker, is the water supply line connected and not leaking? Is the water supply turned on and ice maker control on? Has the anti-tip bracket been installed securely and properly engaging the unit? Is the unit leveled properly with all leveling legs making contact with the floor? Has the kickplate/grille been installed? Are panels attached securely and properly aligned? Has the door been aligned for proper appearance and operation? Does the customer understand the unit's operation? Does the customer have the warranty package? Have any installation or service problems been noted on the product registration card? Has the registration card been mailed in? Have stainless steel panels been inspected for any imperfections? This is to be done by the authorized Sub-Zero dealer or installer with the customer, upon completion of installation. Stainless steel panels are covered by a limited 60-day warranty for cosmetic defects. 21 subzero.com/specs

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24

Integrated Installation
21
Installation Checklist
To ensure a safe and proper installation, the following
checklist should be completed by the installer to ensure
that no part of the installation has been overlooked.
INSTALLATION CHECKLIST
Have all packing materials been removed?
Turn the unit on. Is it operating properly?
Is the power cord plugged into a properly grounded
outlet, which has been installed in accordance with all
applicable electrical codes?
For units with an automatic ice maker, is the water
supply line connected and not leaking? Is the water
supply turned on and ice maker control on?
Has the anti-tip bracket been installed securely and
properly engaging the unit?
Is the unit leveled properly with all leveling legs making
contact with the floor? Has the kickplate/grille been
installed?
Are panels attached securely and properly aligned?
Has the door been aligned for proper appearance and
operation?
Does the customer understand the unit's operation?
Does the customer have the warranty package?
Have any installation or service problems been noted
on the product registration card? Has the registration
card been mailed in?
Have stainless steel panels been inspected for any
imperfections? This is to be done by the authorized
Sub-Zero dealer or installer with the customer, upon
completion of installation. Stainless steel panels are
covered by a limited 60-day warranty for cosmetic
defects.
subzero.com/specs