Sub-Zero BI-42UFD Built-In Installation Guide - Page 7
Dual Flush Inset Installation, Site Preparation
View all Sub-Zero BI-42UFD manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 7 highlights
SITE PREPARATION Opening Dimensions DUAL FLUSH INSET INSTALLATION 26 3/16" (665) FLUSH INSET DEPTH 23/16" (56) 1/4" 11/4" (6) (32) TOP VIEW FINISHED CLEATS* 84" (2134) FLUSH INSET HEIGHT W FLUSH INSET WIDTH 11/4" (32) 4" (102) SIDE VIEW FRONT VIEW *3" (76) typical depth. Shaded areas will be visible and should be finished to match cabinetry. NOTE: Shaded line represents profile of unit with 3/4" (19) panel. 3" (76)* TYPICAL 23/16" (56) DUAL FLUSH INSET WIDTH Two 30" (762) Models 30" (762) and 36" (914) Models Two 36" (914) Models W 621/4" (1581) 681/4" (1734) 741/4" (1886) Dimensions assume a 3/4" (19) panel thickness. A dual installation kit will be required for this installation. subzero.com | 7
subzero.com
|
7
Opening Dimensions
DUAL FLUSH INSET INSTALLATION
84"
(2134)
FLUSH
INSET
HEIGHT
1
/
4
"
(6)
26
3
/
16
"
(665)
FLUSH
INSET
DEPTH
2
3
/
16
"
(56)
*3"
(76)
typical depth. Shaded areas will be visible and should be finished to match cabinetry.
NOTE: Shaded line represents profile of unit with
3
/
4
"
(19)
panel.
FRONT VIEW
SIDE VIEW
TOP VIEW
FINISHED
CLEATS*
1
1
/
4
"
(32)
W
FLUSH INSET WIDTH
4"
(102)
1
1
/
4
"
(32)
2
3
/
16
"
(56)
3"
(76)*
TYPICAL
DUAL FLUSH INSET WIDTH
W
Two 30"
(762)
Models
62
1
/
4
"
(1581)
30"
(762)
and 36"
(914)
Models
68
1
/
4
"
(1734)
Two 36"
(914)
Models
74
1
/
4
"
(1886)
Dimensions assume a
3
/
4
"
(19)
panel thickness. A dual instal-
lation kit will be required for this installation.
SITE PREPARATION