Sub-Zero PRO 48 with Glass Door PRO 48 Installation Guide - Page 11
PRO 48 Installation, Position the Unit - 3 doors down
View all Sub-Zero PRO 48 with Glass Door manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
PRO 48 Installation 11 subzero.com/specs Position the Unit Before moving the PRO 48 unit into position, secure doors and drawers closed and protect any finished flooring. Use an appliance dolly to move the unit near the rough opening. The PRO 48 is equipped with rollers, so it can be moved into position more easily. When securing the unit on the appliance dolly, use the corner protectors (retained from the packing materials) under the strapping to avoid damage to the stainless steel exterior. Also, secure the doors and drawers closed with the strapping. Refer to the illustration below for proper placement of the appliance dolly. IMPORTANT NOTE: The rear levelers must be in their lowest position in order to roll the unit back into the rough opening. Leveling cannot be completed until the unit is in position. IMPORTANT NOTE: If for any reason the unit has been laid on its back or side, you must allow the unit to stand upright for a minimum of 24 hours before connecting power. Shut off power to the electrical outlet. Plug the power cord into the grounded outlet and roll the unit into position. Make sure the anti-tip bracket is properly engaged. The PRO 48 is very heavy-885 lbs (401 kg) or 900 lbs (408 kg). Be sure to have adequate manpower when moving and positioning the unit. Moving the PRO 48.