Sub-Zero PRO 48 with Glass Door PRO 48 Installation Guide - Page 17
PRO 48 Installation, Installation Checklist - parts
View all Sub-Zero PRO 48 with Glass Door manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 17 highlights
PRO 48 Installation Installation Checklist To ensure a safe and proper installation, the following checklist should be completed by the installer to ensure that no part of the installation has been overlooked. INSTALLATION CHECKLIST Have all packing materials been removed? Turn the unit on. Is it operating properly? If not, is the unit plugged in? Is the control turned on? Is the water supply line connected and not leaking? Is the water supply turned on and ice maker control on? Has the anti-tip bracket been installed securely and properly engaging the unit? Is the unit leveled properly on a solid, level floor? Has the drain pan and kickplate been installed? Has the top grille assembly been reinstalled? Are doors and drawers aligned for proper appearance and operation? Is a 90° door stop required? Has the water filter cartridge been removed (for homes with a reverse osmosis system)? Does the customer understand the unit's operation? Does the customer have the warranty package? Have any installation or service problems been noted on the product registration card? Has the registration card been mailed in? Have stainless steel surfaces been inspected for any imperfections? This is to be done by the authorized Sub-Zero dealer or installer with the customer, upon completion of installation. Stainless steel surfaces are covered by a limited 60-day warranty for cosmetic defects. 17 subzero.com/specs