TP-Link T1600G-52TSTL-SG2452 T1600G-28TS V1 Installation Guide - Page 21
Power On, 5 Initialization
View all TP-Link T1600G-52TSTL-SG2452 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 21 highlights
JetStream Gigabit Smart Switch 4.4 Power On Plug in the negative connector of the provided power cord into the power socket of the device, and the positive connector into a power outlet as the following figure shown. Figure 4-3 Connecting to Power Supply Note: The figure is to illustrate the application and principle. The power plug you get from the package and the socket in your situation will comply with the regulation in your country, so they may differ from the figure above. 4.5 Initialization After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically to ensure the device functions properly. During this time, its LED indicators will respond as follows: ■■ The PWR LED indicator will light on all the time. ■■ After keeping off for several seconds, the LED indicators of all the ports will flash momentarily and then turn off again after the initialization. ■■ The SYS LED indicator will flash, which represents a successful initialization. Connection 17