Thermador VCIN36JP Installation Instructions - Page 28

Warning, Caution

Page 28 highlights

VCIBxxJP Installation Procedure WARNING: To avoid electrical shock hazard, before installing, switch power off at the service panel and lock the panel to prevent the power from being switched on accidentally. 5. Hood liner installation a) Slide the liner onto the hood (Figure 34). b) Hold liner flush to the bottom of the housing. Secure the liner to the hood with eighteen (18) x ½" (12.7 mm) screws, as indicated in Figure 35 and Figure 36. CAUTION: The hood weighs at least 60 lbs; therefore, it requires at least two people to lift it safely. Hidden surfaces may have sharp edges. Use caution when handling the appliance. Failure to do so may result in property damage or personal injury. 1. Turn power OFF at the service panel. Lock service panel to prevent power from being turned ON. 2. Prepare ductwork a) See "Ductwork Preparation" on page 7. b) Install metal transition with backdraft damper so that the flap opens up toward the ceiling. If necessary, install thermal break and additional backdraft damper (refer to "Assembly of the Transition" on page 9). 3. Build housing framework a) Refer to "General Information" on page 4 for the applicable model dimensions. b) Refer to "Installation Preparation" on page 6 for clearance specifications. c) Build housing framework for applicable model according to dimensions in "Preparing VCIBxxJP Housing Framework" beginning on page 23. 4. Install blower motor a) Refer to "Blower Motor Installation" beginning on page 11. Figure 33: VCIB Liner Figure 34: VCIB Liner Installation ½" (12,7 mm) x3 cada lado English 26 Figure 35: VCIB Secure Liner Sides

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96

English 26
VCIBxxJP
Installation
Procedure
1.
Turn power OFF
at the service panel. Lock service
panel to prevent power from being turned ON.
2.
Prepare ductwork
a)
See “Ductwork Preparation” on page 7
.
b)
Install metal transition with backdraft damper so
that the flap opens up toward the ceiling. If
necessary, install thermal break and additional
backdraft damper (refer to
“Assembly of the
Transition” on page 9
).
3.
Build housing framework
a)
Refer to “General Information” on page 4
for the
applicable model dimensions.
b)
Refer to “Installation Preparation” on page 6
for
clearance specifications.
c)
Build housing framework for applicable model
according to dimensions
in “Preparing VCIBxxJP
Housing Framework” beginning on page 23.
4.
Install blower motor
a)
Refer to
“Blower Motor Installation” beginning on
page 11
.
5.
Hood liner installation
a)
Slide the liner onto the hood (
Figure 34)
.
b)
Hold liner flush to the bottom of the housing.
Secure the liner to the hood with eighteen (18) x ½”
(12.7 mm) screws, as indicated in
Figure 35
and
Figure 36
.
WARNING:
To avoid electrical shock hazard, before installing, switch
power off at the service panel and lock the panel to
prevent the power from being switched on accidentally.
CAUTION:
The hood weighs at least 60 lbs; therefore, it
requires at least two people to lift it safely.
Hidden surfaces may have sharp edges.
Use caution when handling the appliance.
Failure to do so may result in property
damage or personal injury.
Figure 33: VCIB Liner
Figure 34: VCIB Liner Installation
Figure 35: VCIB Secure Liner Sides
½" (12,7 mm)
x3 cada lado