Thermador VCIN36JP Installation Instructions - Page 28
Warning, Caution
View all Thermador VCIN36JP manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 28 highlights
VCIBxxJP Installation Procedure WARNING: To avoid electrical shock hazard, before installing, switch power off at the service panel and lock the panel to prevent the power from being switched on accidentally. 5. Hood liner installation a) Slide the liner onto the hood (Figure 34). b) Hold liner flush to the bottom of the housing. Secure the liner to the hood with eighteen (18) x ½" (12.7 mm) screws, as indicated in Figure 35 and Figure 36. CAUTION: The hood weighs at least 60 lbs; therefore, it requires at least two people to lift it safely. Hidden surfaces may have sharp edges. Use caution when handling the appliance. Failure to do so may result in property damage or personal injury. 1. Turn power OFF at the service panel. Lock service panel to prevent power from being turned ON. 2. Prepare ductwork a) See "Ductwork Preparation" on page 7. b) Install metal transition with backdraft damper so that the flap opens up toward the ceiling. If necessary, install thermal break and additional backdraft damper (refer to "Assembly of the Transition" on page 9). 3. Build housing framework a) Refer to "General Information" on page 4 for the applicable model dimensions. b) Refer to "Installation Preparation" on page 6 for clearance specifications. c) Build housing framework for applicable model according to dimensions in "Preparing VCIBxxJP Housing Framework" beginning on page 23. 4. Install blower motor a) Refer to "Blower Motor Installation" beginning on page 11. Figure 33: VCIB Liner Figure 34: VCIB Liner Installation ½" (12,7 mm) x3 cada lado English 26 Figure 35: VCIB Secure Liner Sides