Weider 1120 English Manual - Page 14

Tighten the High Cable 55 into the Weight Tube

Page 14 highlights

26. Wrap the High Cable (55) under a 90mm Pulley 26 (48). Attach the Pulley, a Cable Trap (51), and two Half Finger Guards (43) at the upper hole in the "U"-bracket (45) with an M10 x 51mm Bolt (66) and an M10 Nylon Locknut. Make sure the Cable Trap is oriented to hold the Cable in the groove of the Pulley and that the Finger Guards are on the outside of the "U"-bracket. 27. Route the High Cable (55) up through the Top 27 Frame (4) and over a 90mm Thin Pulley (47). Attach the Pulley inside of the Top Frame with the M10 x 67mm Bolt (71) used in step 25, an 11mm Spacer (49), an M10 Washer (57), and an M10 Nylon Locknut (56). 55 56 43 48 51 66 45 43 55 56 49 57 47 4 71 28. Route the High Cable (55) over a 90mm Pulley 28 (48) and down through the Top Frame (4). Attach the Pulley inside of the Top Frame with an M10 x 67mm Bolt (71), two M10 Washers (57), two 12mm Spacers (52), and an M10 Nylon Locknut (56). 56 52 57 4 48 55 52 57 71 29. Note: The shroud is shown removed in this 29 step for clarity. Thread an M12 Nut (84) all the way onto the High Cable (55). Place a Large Washer (85) on top of the Weight Tube (24). Tighten the High Cable (55) into the Weight Tube (24) until all the slack is removed from the cables. Tighten the M12 Nut (84) against the Large Washer (85). 55 84 85 24 14

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

14
26. Wrap the High Cable (55) under a 90mm Pulley
(48). Attach the Pulley, a Cable Trap (51), and
two Half Finger Guards (43) at the upper hole in
the ā€œUā€-bracket (45) with an M10 x 51mm Bolt
(66) and an M10 Nylon Locknut.
Make sure the
Cable Trap is oriented to hold the Cable in the
groove of the Pulley and that the Finger
Guards are on the outside of the ā€œUā€-bracket.
28. Route the High Cable (55) over a 90mm Pulley
(48) and down through the Top Frame (4). Attach
the Pulley inside of the Top Frame with an M10 x
67mm Bolt (71), two M10 Washers (57), two
12mm Spacers (52), and an M10 Nylon Locknut
(56).
29.
Note: The shroud is shown removed in this
step for clarity.
Thread an M12 Nut (84) all the way onto the High
Cable (55). Place a Large Washer (85) on top of
the Weight Tube (24).
Tighten the High Cable (55) into the Weight Tube
(24) until all the slack is removed from the cables.
Tighten the M12 Nut (84) against the Large
Washer (85).
27. Route the High Cable (55) up through the Top
Frame (4) and over a 90mm Thin Pulley (47).
Attach the Pulley inside of the Top Frame with the
M10 x 67mm Bolt (71) used in step 25, an 11mm
Spacer (49), an M10 Washer (57), and an M10
Nylon Locknut (56).
26
27
28
29
66
51
56
48
55
43
43
45
55
47
71
71
4
49
57
56
55
52
52
48
57
4
57
56
55
84
85
24