Weider 8620 English Manual - Page 10
Cable Assembly - cable diagram
View all Weider 8620 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
CABLE ASSEMBLY 14. During steps 15 through 29, refer to the CABLE DIAGRAM on page 19 of this manual to verify proper cable routing. Before beginning this section, identify the Long Cable (23) and the Short Cable (58) by comparing the lengths of the cables. IMPORTANT: While assembling the cables, do not overtighten the bolts and nuts securing the pulleys. The pulleys must be able to turn freely. 14 23 58 15. Locate the Long Cable (23). Route the Long Cable around the indicated 3 1/2Ó Pulley (15) 15 attached to the Top Frame (55). Be sure that 55 23 the end of the Cable with the ball is on the indicated side of the Pulley and that the Cable is between the Pulley and the hook. Tighten the 3/8Ó x 3 3/4Ó Bolt (71) and the 3/8Ó Nylon Locknut (not shown). 15 Ball 71 Hook 16. Wrap the Long Cable (23) around a ÒVÓ-Pulley (6). Attach the ÒVÓ-Pulley and a Long Cable 16 Trap (50) to the indicated bracket on the Front Upright (42) with a 3/8Ó x 2 1/2Ó Bolt (7) and a 3/8Ó Nylon Locknut (21). Be sure that the Long Cable Trap is positioned to hold the Cable in place. 17. Route the Long Cable (23) around the ÒVÓ- 17 Pulley (6) on the Left Arm (47). Be sure that the Cable is in the groove of the Pulley and that the Long Cable Trap (50) is posi- tioned to hold the Cable in place. Tighten the 3/8Ó x 2 1/2Ó Bolt (7) and the 3/8Ó Nylon Locknut (not shown). 7 6 50 42 23 21 6 7 50 47 23 10