Weider Pro 235 Bench English Manual - Page 7

Lift the Weight Rest 9 in the Right Upright 7

Page 7 highlights

2. Lift the Weight Rest (9) in the Right Upright (7) 2 and secure it in a raised position with a Weight Rest Knob (23). Attach the Right Upright (7) to the right Crossbar Extension (5) with four M10 x 80mm Bolts (38), two Joint Plates (18), and four M10 Nylon Locknuts (48). Do not tighten the Locknuts yet. Repeat this step with the Left Upright (not shown). 9 23 7 18 38 3. Attach the Front Leg (2) to the Bench Frame (1) 3 with two M10 x 65mm Bolts (35), two M10 Washers (46), and two M10 Nylon Locknuts (48). Do not tighten the Locknuts yet. 38 2 46 48 46 48 18 48 5 35 1 35 4. Attach the Bench Frame (1) to the center holes in 4 the Crossbar (4) with two M10 x 75mm Bolts (43) and two M10 Nylon Locknuts (48). Tighten the M10 Nylon Locknuts (48) used in steps 1-4. 4 Center Holes 48 43 1 43 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16

7
4
2.
Lift the Weight Rest (9) in the Right Upright (7)
and secure it in a raised position with a Weight
Rest Knob (23).
Attach the Right Upright (7) to the right Crossbar
Extension (5) with four M10 x 80mm Bolts (38),
two Joint Plates (18), and four M10 Nylon
Locknuts (48).
Do not tighten the Locknuts yet.
Repeat this step with the Left Upright (not
shown).
3.
Attach the Front Leg (2) to the Bench Frame (1)
with two M10 x 65mm Bolts (35), two M10
Washers (46), and two M10 Nylon Locknuts (48).
Do not tighten the Locknuts yet.
4.
Attach the Bench Frame (1) to the center holes in
the Crossbar (4) with two M10 x 75mm Bolts (43)
and two M10 Nylon Locknuts (48).
Tighten the M10 Nylon Locknuts (48) used in
steps 1–4.
3
2
35
35
18
38
38
18
2
48
5
48
48
48
46
46
1
1
43
43
4
Center
Holes
7
23
9