Weider Pro 4000 Uk Manual - Page 11

Attach the V-pulley, a Large Cable Trap

Page 11 highlights

14. Route the Arm Cable (54) over a "V"-pulley 14 (46). Attach the "V"-pulley, a Large Cable Trap (50), and two Guards (41) to the Upright (3) with an M10 x 62mm Button Bolt (75) and an M10 Nylon Locknut (56). Make sure the Cable Trap is oriented to hold the Cable in the groove of the "V"-pulley. 3 56 41 46 41 54 50 75 15. Route the Arm Cable (54) under a 90mm Pulley 15 (48). Attach the Pulley and two Half Guards (43) to the Double "U"-bracket (63) with an M10 x 45mm Button Bolt (81) and an M10 Nylon Locknut (56). Make sure the Half Guards are on the outside of the Double "U"-bracket as shown. 16. Route the Arm Cable (54) over a "V"-pulley 16 (46). Attach the "V"-pulley, a Large Cable Trap (50), and two Guards (41) to the Upright (3) with an M10 x 62mm Button Bolt (75) and an M10 Nylon Locknut (56). Make sure the Cable Trap is oriented to hold the Cable in the groove of the "V"-pulley. 17. Grease an M8 x 19mm Shoulder Bolt (65). 17 Attach the Arm Cable (54) to the indicated Cable Pivot (39) with the Shoulder Bolt and an M8 Nylon Locknut (58). Make sure that the Cable can pivot freely around the Shoulder Bolt. 54 48 43 81 56 43 63 75 41 50 54 41 46 3 56 Grease 54 39 65 58 11

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

11
14. Route the Arm Cable (54) over a “V”-pulley
(46). Attach the “V”-pulley, a Large Cable Trap
(50), and two Guards (41) to the Upright (3)
with an M10 x 62mm Button Bolt (75) and an
M10 Nylon Locknut (56).
Make sure the Cable
Trap is oriented to hold the Cable in the
groove of the “V”-pulley.
16. Route the Arm Cable (54) over a “V”-pulley
(46). Attach the “V”-pulley, a Large Cable Trap
(50), and two Guards (41) to the Upright (3)
with an M10 x 62mm Button Bolt (75) and an
M10 Nylon Locknut (56).
Make sure the Cable
Trap is oriented to hold the Cable in the
groove of the “V”-pulley.
17. Grease an M8 x 19mm Shoulder Bolt (65).
Attach the Arm Cable (54) to the indicated
Cable Pivot (39) with the Shoulder Bolt and an
M8 Nylon Locknut (58).
Make sure that the
Cable can pivot freely around the Shoulder
Bolt.
15. Route the Arm Cable (54) under a 90mm Pulley
(48). Attach the Pulley and two Half Guards
(43) to the Double “U”-bracket (63) with an M10
x 45mm Button Bolt (81) and an M10 Nylon
Locknut (56).
Make sure the Half Guards are
on the outside of the Double “U”-bracket as
shown.
56
3
46
50
41
75
54
41
14
48
43
43
63
81
56
54
15
16
17
56
3
54
46
50
41
75
41
58
65
54
39
Grease