Weslo Cadence G 3.9 Instruction Manual - Page 8

firmly tighten the Screws., IMPORTANT: Have a second person hold the, Frame until step 7 is

Page 8 highlights

4. Pivot the Handrails (52) down to the horizontal position. 4 52 52 5. Tighten an M8 x 15mm Screw (3) with an M8 Washer (5) into the bottom of each Handrail (52) 5 as shown; firmly tighten the Screws. 52 5 3 52 6. Raise the Frame (40) to the upright position. IMPORTANT: Have a second person hold the Frame until step 7 is completed. Remove the M8 Jam Nut (18) and the M8 x 35mm Bolt (10) from the bracket on the Base (35). Next, orient the Storage Latch (58) as shown. Attach the lower end of the Storage Latch (58) to the bracket on the Base (35) with the M8 x 35mm Bolt (10) and the M8 Jam Nut (18). Then, raise the Storage Latch (58) to a vertical position, and remove the tie (A). 6 40 8 5 3 A 58 18 35 10

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24

8
4.
Pivot the Handrails (52) down to the horizontal
position.
4
52
52
5.
Tighten an M8 x 15mm Screw (3) with an M8
Washer (5) into the bottom of each Handrail (52)
as shown;
firmly tighten the Screws.
5
52
52
5
3
6.
Raise the Frame (40) to the upright position.
IMPORTANT: Have a second person hold the
Frame until step 7 is completed.
Remove the M8 Jam Nut (18) and the M8 x
35mm Bolt (10) from the bracket on the Base
(35).
Next, orient the Storage Latch (58) as shown.
Attach the lower end of the Storage Latch (58)
to the bracket on the Base (35) with the M8 x
35mm Bolt (10) and the M8 Jam Nut (18).
Then, raise the Storage Latch (58) to a vertical
position, and remove the tie (A).
35
58
10
18
A
6
40
5
3