Zanussi ZHT610X User Manual - Page 7

Electrical connection and working test, fig. 11 - installation

Page 7 highlights

Part 1 - INSTALLATION INSTRUCTIONS 2 - Connecting filter hoods (air is filtered and recirculated inside the room) Open the grid panel, check that the lever (hood with one motor) or the handle (hood with two motors) points to the filter mode position (fig. 11), insert the charcoal filter (see par.3.3 2 part 2°). 11 3.4 - Electrical connection and working test 1 - The safety measures 2.2, 2.3 and 2.4 of paragraph 2 are to be strictly observed. 2 - Once the electrical connection has been completed, check that the worktop illumination, motor and speeds work properly. 14

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10

14
Part 1 - INSTALLATION INSTRUCTIONS
2 -
Connecting filter hoods (air is filtered and recirculated inside the room)
Open the grid panel, check that the lever (hood with one motor) or the handle (hood
with two motors) points to the filter mode position
(fig. 11)
, insert the charcoal filter
(see par.3.3 2 part 2
°
).
3.4 - Electrical connection and working test
1 -
The safety measures 2.2, 2.3 and 2.4 of paragraph 2 are to be strictly observed.
2 -
Once the electrical connection has been completed, check that the worktop
illumination, motor and speeds work properly.
11
11
11