Biostar IDEQ 210V iDEQ 210V user'smanual - Page 52
Completing, Installing
View all Biostar IDEQ 210V manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 52 highlights
• Collect the cable of LEDs Indicator and front- - a panel switches to "JPANEL1" connector on the Mainboard. • Concoct the cable of system fan to "JSFAN1" connector on the mainbeard. Here A.7 ' r Completing the Installing • Place the front panel back and fix it with four screws to complete the Installation of mainheard. 'JO Flpre A.8 I -4 4 g •I Figure A.9 Note: The figures show the locations of connecters on M7NBA maleboard. Please refer to section 2 -- the mainboard layout of M7VBA for the correct locations of the connectors. 44
•
Collect
the
cable
of
LEDs
Indicator
and
front
-
panel
switches
to
"JPANEL1"
connector
on
the
Mainboard.
•
Concoct
the
cable
of
system
fan
to
"JSFAN1"
connector
on
the
mainbeard.
Completing
the
Installing
•
Place
the
front
panel
back
and
fi
x
it
with
four
screws
to
complete
the
Installation
of
mainheard.
—
a
I
'
r
•
I
Here
A.7
'J
O
Flpre
A.8
-4
4
g
Figure
A.9
Note:
The
figures
show
the
locations
of
connecters
on
M7NBA
maleboard.
Please
refer
to
section
2
--
the
mainboard
layout
of
M7VBA
for
the
correct
locations
of
the
connectors.
44