Bosch HMV9302 Installation Instructions - Page 5
Parts, Tools, Materials
UPC - 825225830412
View all Bosch HMV9302 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
PARTS, TOOLS, MATERIALS THE FOLLOWING PARTS ARE SUPPLIED WITH THE OVEN: NOTE: Depending on your ventilation requirements, you may not use all of these parts. Damper/duct connector (for roof vented or wall vented installation) Not Actual Size One power cord clamp and One dark-colored mounting screw (to hold the power cord) Actual Size One power cord clamp bushing - Actual Size (for the cord hole in a metal upper cabinet) Four 1/4" x 2" lag screws - Actual Size (for wall stud holes) Two 1/4" x 3" bolts - Actual Size (for securing to the upper cabinet) OR Four spring toggle heads - Actual Size (for the toggle bolts) Four 1/4" x 3" toggle bolts - Actual Size (for drywall holes) Two tapping screws - Actual Size (for attaching the damper duct connector) One upper cabinet template - Not Actual Size 10- 8" Upper-cabinet template Roof-venting installation B C D centerline 12" 6" 11 4" 10- 3 16 8- Left side Right side NOTE: You need to install at least one lag screw into a 2" x 4" stud and four anchor bolts into the wall, and the mounting area must meet the 150 lbs. weight requirement. 5