Bosch SHE68E05UC Installation Instructions - Page 5

Tools and Materials Needed

Page 5 highlights

Tools and Materials Needed Hammer Hole Saw Pipe Wrench Adjustable Wrench Tape Measure Slot Screwdriver Phillips Screwdriver T-20 Screwdriver Wire Cutter Wire Stripper Drill Level Electrical Supply Cable - Minimum #14 AWG, 2 conductor, 1 ground, insulated copper conductors rated 75°C or higher. Hot Water Supply Line - Minimum 3/8" O.D. copper tubing or metal braided dishwasher supply line. Shut-off valve and fittings appropriate for hot water supply line (copper tubing/compression fitting, or braided hose). UL listed conduit connector or strain relief is required if you attach the field wiring directly to the terminal block. 4

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39

4
Electrical Supply Cable - Minimum #14 AWG, 2 conduc-
tor, 1 ground, insulated copper conductors rated 75°C or
higher.
Hot Water Supply Line - Minimum 3/8” O.D. copper tub-
ing or metal braided dishwasher supply line.
Shut-off valve and fittings appropriate for hot water sup-
ply line (copper tubing/compression fitting, or braided
hose).
UL listed conduit connector or strain relief is required if
you attach the field wiring directly to the terminal block.
Hammer
Hole Saw
Pipe Wrench
Tape Measure
Slot Screwdriver
Phillips Screwdriver
T-20 Screwdriver
Wire Cutter
Wire Stripper
Drill
Level
Adjustable Wrench
Tools and Materials Needed