D-Link DFL-80 User Manual - Page 63
Adding a new Schedule, Modifying a Schedule
View all D-Link DFL-80 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 63 highlights
Adding a new Schedule: Step 1: Click on the New Entry button and the Add New Schedule window will appear. Step 2: Schedule Name: Fill in a name for the new schedule. Period 1: Configure the start and stop time for the days of the week that the schedule will be active. Step 3: Click OK to save the new schedule or click Cancel to cancel adding the new schedule. Modifying a Schedule: Step 1: In the Schedule window, find the policy to be modified and click the corresponding Modify option in the Configure field. Step 2: Make necessary changes. Step 3: Click OK to save changes. 63
63
Adding a new Schedule:
Step 1:
Click on the
New Entry
button and the
Add New Schedule
window
will appear.
Step 2:
Schedule Name:
Fill in a name for the new schedule.
Period 1:
Configure the start and stop time for the days of the
week that the schedule will be active.
Step 3:
Click
OK
to save the new schedule or click
Cancel
to cancel
adding the new schedule.
Modifying a Schedule:
Step 1:
In the
Schedule
window, find the policy to be modified and click the
corresponding
Modify
option in the
Configure
field.
Step 2:
Make necessary changes.
Step 3:
Click
OK
to save changes.