Dell PowerStore 9000X EMC PowerStore Network Planning Guide - Page 34
Table 12. PowerStore T model Network Setup Preparation Worksheet blank continued, Step details, Notes
View all Dell PowerStore 9000X manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 34 highlights
Table 12. PowerStore T model Network Setup Preparation Worksheet (blank) (continued) Step Step details Notes Management Uplink A to Management Uplink B to 7. Record the VLAN IDs that will be used on the OOB management switch: Remote Discovery (untagged) Management (untagged) 8. Record the VLAN IDs that will be used on the Top-of-Rack (ToR) switches: Storage network (tagged) NAS (tagged) Internal (untagged) 9. Reserve and record the IP addresses necessary to configure the switch below: Management IP address for out-of-band management switch Management IP address for switch 1 Management IP address for switch 2 Default gateway NTP server 10. Dell EMC supports deploying PowerStore T model with two Top-of-Rack (ToR) switches with a layer 2 interconnect link. Choose which type of layer 2 interconnect you will use: Highly Recommended: Multi-chassis Link Aggregation Group (MC-LAG) If you will be using MC-LAG, record the ports you will use to connect the switches together. Switch to switch port pair 1 Switch to switch port pair 2 Alternative to MC-LAG: Reliable L2 uplinks 11. If using MC-LAG, enter the Domain ID. 12. If using VLT for the Layer 2 interconnect, record the: VLT MAC address to use for both switch 1 and switch 2. Use the same VLT MAC address for switch 1 and switch 2. NOTE: You cannot use all zeros (00:00:00:00:00) for the VLT MAC address. VLT priority for switch 1 VLT priority for switch 2 13. If configuring with Link Aggregation Control Protocol (LACP) record the LACP (port channel) ID for the node connections: Port Channel ID for Node A Port Channel ID for Node B 14. Record the ports on the ToR switches that will be used to connect to the uplinks. Uplink A to ToR 1 34 PowerStore Network Setup Preparation Worksheets