GE PSHS9PGZSS Use and Care Manual - Page 24
Replace The Base Grille, Set The Controls, Start The Icemaker, Cont., The Ice Bin.
UPC - 084691210627
View all GE PSHS9PGZSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 24 highlights
Installation Instructions INSTALLING THE REFRIGERATOR (CONT.) 7 REPLACE THE BASE GRILLE Replace the grille by installing the two Phillips head screws. 9 START THE ICEMAKER Set the icemaker power switch to the I (on) position. The icemaker will not begin to operate until it reaches its operating temperature of 15°F (-9°C) or below. It will then begin operation automatically. It will take 2-3 days to fill the ice bin. Power switch 8 SET THE CONTROLS Set the controls to the recommended setting. NOTE: In lower water pressure conditions, the water valve may turn on up to 3 times to deliver enough water to the icemaker. 24
24
Installation Instructions
REPLACE THE BASE GRILLE
Replace the grille by installing the two Phillips
head screws.
7
SET THE CONTROLS
Set the controls to the recommended setting.
8
START THE ICEMAKER
Set the icemaker power switch to the
I (on)
position. The icemaker will not begin to operate
until it reaches its operating temperature of
15°F (–9°C) or below. It will then begin operation
automatically. It will take 2–3 days to fill
the ice bin.
NOTE:
In lower water pressure conditions, the water
valve may turn on up to 3 times to deliver
enough water to the icemaker.
9
Power
switch
INSTALLING THE REFRIGERATOR
(CONT.)