Haier RBFS21SIAS User Manual - Page 9
Connect the pipe to the valve, Clean the Pipe, Connect the pipe to the refrigerator.
View all Haier RBFS21SIAS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 9 highlights
Connecting the Water Supply Line 7. Connect the pipe to the valve Put the Tightened nuts and the copper shaft on the end side of the pipe and connect the pipe to the stopping valve. Make sure that the pipe is cut into the valve completely. Tighten and press the nut. )ROORZ WKH GHVFULSWLRQV VSHFL¿HG LQ &05 RI 0DVVDFKXVHWWV )HGHUDO 3LSLQJ Standard. Saddle-backed is unlawful in Massachusetts and is forbidden. Please consult the plumber's mate with working license. 8. Clean the Pipe Power the main water supply till the water in the pipe becomes clean. Turn off the water valve after having used water of about 1v. 9. Connect the pipe to the refrigerator. Note Before connecting the pipe to the refrigerator, make sure that the power line is not cut into the electric plug on the wall. (1) Tighten the water pipe on the water valve and take the nut off the water pipe. $QGWKHQDVVKRZQLQWKH¿JXUHFRQQHFWWKHHQGVLGHRIWKHZDWHUSLSHWR the water valve; tighten the water pipe using tightening nuts. 8