HP Integrity rx8620 Site Preparation Guide, Fourth Edition - HP Integrity rx86 - Page 46

Sample Site Inspection Checklist

Page 46 highlights

General Site Preparation Guidelines Sample Site Inspection Checklist Sample Site Inspection Checklist Table 2-5 Customer and HP Information Customer Information Name: Phone Number: Street Address: City or Town: State or Province: Country Zip or postal code: Primary customer contact: Phone Number: Secondary customer contact: Phone Number: Traffic coordinator: Phone Number: HP information Sales representative Order Number: Representative making survey Date: Scheduled delivery date Table 2-6 Site Inspection Checklist Please check either Yes or No. If No, include comment number or date Computer room Number Area or condition Yes No 1. Is there a completed floor plan? 2. Is there adequate space for maintenance needs? Front 36 in. (91.4 cm) minimum, rear 36 in. (91.4 cm) minimum are recommended clearances. 3. Is access to the site or computer room restricted? 4. Is the computer room structurally complete? Expected date of completion? 5. Is a raised floor installed and in good condition? 6. Is the raised floor adequate for equipment loading? Comment or Date 40 Chapter 2

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68

Chapter 2
General Site Preparation Guidelines
Sample Site Inspection Checklist
40
Sample Site Inspection Checklist
Table 2-5
Customer and HP Information
Customer Information
Name:
Phone Number:
Street Address:
City
or
Town:
State or Province:
Country
Zip or postal code:
Primary customer contact:
Phone Number:
Secondary customer contact:
Phone Number:
Traffic coordinator:
Phone Number:
HP information
Sales representative
Order Number:
Representative making survey
Date:
Scheduled delivery date
Table 2-6
Site Inspection Checklist
Please check either Yes or No. If No, include comment number or date
Comment
or Date
Computer room
Number
Area or condition
Yes
No
1.
Is there a completed floor plan?
2.
Is there adequate space for maintenance needs?
Front 36 in. (91.4 cm) minimum, rear 36 in.
(91.4 cm) minimum are recommended
clearances.
3.
Is access to the site or computer room
restricted?
4.
Is the computer room structurally complete?
Expected date of completion?
5.
Is a raised floor installed and in good condition?
6.
Is the raised floor adequate for equipment
loading?