HP Integrity rx8620 Site Preparation Guide, Fourth Edition - HP Integrity rx86 - Page 48

Please check either Yes or No. If No, include comment number or date, Comment, or Date

Page 48 highlights

General Site Preparation Guidelines Sample Site Inspection Checklist Table 2-6 Site Inspection Checklist (Continued) Please check either Yes or No. If No, include comment number or date 24. 25. 26. Cooling Number 27. 28. 29. 30. Storage Number 31. 32. Training Number 33 34 Is there a fire protection system in the computer room? Is antistatic flooring installed? Are there any equipment servicing hazards (loose ground wires, poor lighting, and so on)? Area or condition Yes No Can cooling be maintained between 5°C and 35°C (up to 5000 ft)? Derate 1 °C/1000 ft above 5000 ft and up to 10,000 ft. Can temperature changes be held to 5 °C per hour with tape media? Can temperature changes be held to 20 °C per hour without tape media? Can humidity level be maintained at 40% to 55% at 35 °C noncondensing? Are air-conditioning filters installed and clean? Area or condition Yes No Are cabinets available for tape and disc media? Is shelving available for documentation? Area or condition Are personnel enrolled in the System Administrator's Course? Is on-site training required? Comment or Date 42 Chapter 2

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68

Chapter 2
General Site Preparation Guidelines
Sample Site Inspection Checklist
42
24.
Is there a fire protection system in the
computer room?
25.
Is antistatic flooring installed?
26.
Are there any equipment servicing hazards
(loose ground wires, poor lighting, and so on)?
Cooling
Number
Area or condition
Yes
No
27.
Can cooling be maintained between 5
°
C and
35
°
C (up to 5000 ft)? Derate 1
°
C/1000 ft above
5000 ft and up to 10,000 ft.
28.
Can temperature changes be held to
5
°
C per
hour with tape media? Can temperature
changes be held to 20
°
C per hour without tape
media?
29.
Can humidity level be maintained at 40% to
55% at 35
°
C noncondensing?
30.
Are air-conditioning filters installed and clean?
Storage
Number
Area or condition
Yes
No
31.
Are cabinets available for tape and disc media?
32.
Is shelving available for documentation?
Training
Number
Area or condition
33
Are personnel enrolled in the System
Administrator’s Course?
34
Is on-site training required?
Table 2-6
Site Inspection Checklist (Continued)
Please check either Yes or No. If No, include comment number or date
Comment
or Date