HP Integrity rx8620 Site Preparation Guide, Fourth Edition - HP Integrity rx86 - Page 67

Index

Page 67 highlights

A AC power specifications, 5 air ducts, 10 illustrated, 10 air-conditioning ducts, 25 requirements, 23 system recommendations, 24 air-distribution system room space return air, 24 B backplane mass storage, 4 system, 4, 8 basic air-distribution systems, 24 C cell board, 4, 8 circuit breaker, 5 component power requirements, 6 computer room layout plan, 54 computer room safety fire protection, 14 computer system air ducts, 10 environmental elements, 23 power system protection, 17 sample installation schedule, 39 cooling, 8 cooling requirements, 23 D data communications cables, 22 dimensions and weights, 4 E electrical and environmental guidelines air-distribution system, 24 computer equipment grounds, 18 computer room safety fire protection, 14 dust and pollution control, 25 electrical conduit ground, 18 grounding systems, 18 lighting requirements, 15 main building electrical ground, 18 power distribution safety grounding, 18 power panel grounds, 18 power quality, 15 sources of electrical disturbances, 16 system installation guidelines, 22 electrical load requirements, 15 electrical specifications, 5 environmental elements, 23 acoustics, 28 air-conditioning equipment requirements, 23 air-conditioning recommendations, 24 Index air-distribution systems, 24 computer room considerations, 23 cooling requirements, 23 dust and pollution control, 25 electrostatic discharge prevention, 27 humidity level, 25 static protection measures, 27 environmental specifications, 8 equipment footprint templates, 53 example installation schedule, 39 F facility characteristics, 29 facility guidelines characteristics, 29 computer room layout, 54 equipment footprint templates, 53 floor loading terms, 29 floor-plan grid, 33 operational space requirements, 32 typical raised floor site, 30 windows, 31 fire protection, 14 floor loading raised floor, 29 G grounding, 5 grounding systems, 18 electrical conduit ground, 18 H humidity, 8 humidity level, 25 L lighting requirements, 15 M main building electrical ground, 18 mass storage backplane, 4 N noise emission specifications, 10 O operating environment, 8 P power cords, 5 power distribution hardware, 17 safety grounding, 18 power quality, 15 power requirements component, 6 power system protection, 17 61

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68

61
Index
A
AC power specifications
,
5
air ducts
,
10
illustrated
,
10
air-conditioning
ducts
,
25
requirements
,
23
system recommendations
,
24
air-distribution system
room space return air
,
24
B
backplane
mass storage
,
4
system
,
4
,
8
basic air-distribution systems
,
24
C
cell board
,
4
,
8
circuit breaker
,
5
component
power requirements
,
6
computer room layout plan
,
54
computer room safety
fire protection
,
14
computer system
air ducts
,
10
environmental elements
,
23
power system protection
,
17
sample installation schedule
,
39
cooling
,
8
cooling requirements
,
23
D
data communications cables
,
22
dimensions and weights
,
4
E
electrical and environmental guidelines
air-distribution system
,
24
computer equipment grounds
,
18
computer room safety
fire protection
,
14
dust and pollution control
,
25
electrical conduit ground
,
18
grounding systems
,
18
lighting requirements
,
15
main building electrical ground
,
18
power distribution safety grounding
,
18
power panel grounds
,
18
power quality
,
15
sources of electrical disturbances
,
16
system installation guidelines
,
22
electrical load requirements
,
15
electrical specifications
,
5
environmental elements
,
23
acoustics
,
28
air-conditioning equipment requirements
,
23
air-conditioning recommendations
,
24
air-distribution systems
,
24
computer room considerations
,
23
cooling requirements
,
23
dust and pollution control
,
25
electrostatic discharge
prevention
,
27
humidity level
,
25
static protection measures
,
27
environmental specifications
,
8
equipment footprint templates
,
53
example installation schedule
,
39
F
facility characteristics
,
29
facility guidelines
characteristics
,
29
computer room layout
,
54
equipment footprint templates
,
53
floor loading terms
,
29
floor-plan grid
,
33
operational space requirements
,
32
typical raised floor site
,
30
windows
,
31
fire protection
,
14
floor loading
raised floor
,
29
G
grounding
,
5
grounding systems
,
18
electrical conduit ground
,
18
H
humidity
,
8
humidity level
,
25
L
lighting requirements
,
15
M
main building electrical ground
,
18
mass storage backplane
,
4
N
noise emission specifications
,
10
O
operating environment
,
8
P
power cords
,
5
power distribution
hardware
,
17
safety grounding
,
18
power quality
,
15
power requirements
component
,
6
power system protection
,
17