Hunter 81030 Owner's Manual - Page 8

New Construction - suspended between joists

Page 8 highlights

New Construction - suspended between joists B11 B12 E D Slide the mounting rails into brackets. 5/8 5/8 1/2 1/2 Position the correct depth mark at the bottom edge of the joist based on the thickness of your sheetrock. B13 B14 1/8" Bit E Mark position of screws by using holes as a template. Drill a hole in the center of each outline. B15 B16 Insert screws, leaving space between the screw head and the joist. Screws are not provided. Attach the rails onto the screws. 8 43034-01 09/12/2011

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42

43034-01
09/12/2011
8
B11
D
E
5/8
1/2
5/8
1/2
B12
1/8"
Bit
B14
B15
B16
E
B13
Slide the mounting rails into brackets.
Mark position of screws by using holes as a template.
Insert screws, leaving space between the screw
head and the joist. Screws are not provided.
New Construction – suspended between joists
Position the correct depth mark at the bottom edge of
the joist based on the thickness of your sheetrock.
Drill a hole in the center of each outline.
Attach the rails onto the screws.