Husqvarna AUTOMOWER 220 AC Owners Manual - Page 32
Checking the installation, 7 Linking Automower, to the, charging station
View all Husqvarna AUTOMOWER 220 AC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 32 highlights
3. INSTALLATION 7. Refit the cover on the charging station. Ensure the three guides on the charging station enter the right holes in the cover. 3.6 Checking the installation Check the loop signal by looking to see what indication the green LED on the charging station is giving. • Steady light = the signal is okay. • Flashing once every other second = break in the loop and no signal found. • Flashing twice every other second = weak signal. This may be due to the boundary wire exceeding 1600 ft or that the cable is damaged. If the mower works, it is not a problem. 3.7 Linking Automower™ to the charging station 1. Open the control panel cover by pressing the STOP button. 2. Place Automower in the charging station. 3. Set the main switch to the ON position. A start-up sequence begins when Automower is started for the first time. The following is requested: Language, time format, correct time, date format, date, and four-digit PIN code. All combinations except 0000 are permitted. When you have chosen a PIN code with Automower placed in the charging station, the mower and charging station are then linked to each other. 3012-270 3012-282 3012-385 3012-408 English - 33