LG DLG1502W Owners Manual - English Spanish - Page 23

Warning

Page 23 highlights

ENGLISH INSTALLATION INSTRUCTIONS 23 Connecting Electric Dryers (cont.) USA only wWarning • Connect the power cord to the terminal block. Connect each power cord wire to the terminal block screw that has the same colored wire. For example, connect the black power cord wire to the terminal block screw with the black wire. Failure to follow these instructions may result in a short, overload, fire or death. • Grounding through the neutral conductor is prohibited for: (1) new branch-circuit installations, (2) mobile homes, (3) recreational vehicles, and (4) areas where local codes prohibit grounding through the neutral conductor. Four-wire connection for electric dryers: Direct wire • A 4-wire connection is required for all mobile and manufactured home installations, as well as all new construction after January 1, 1996. • A UL-listed strain relief is required. 1. Remove 5 inches (12.7 cm) of the outer covering from the wire. Remove 5 inches of insulation from the ground wire. Cut off approximately 11⁄₂ inches (3.8 cm) from the other three wires and strip 1 inch (2.5 cm) insulation from each wire. Bend the ends of the three shorter wires into a hook shape. 1" (2.5 cm) • Use UL-listed 4-wire #10 AWG-minimum copper conductor cable. • Allow at least 5 ft. (1.5 m) length to allow for removal and reinstallation of the dryer. 3. Transfer the dryer's ground wire from behind the green ground screw to the center screw of the terminal block. Attach the two hot leads of the power cable to the outer terminal block screws. Attach the white neutral wire to the center terminal block screw. Attach the power cable ground wire to the green ground screw. Tighten aLl screws securely. Reinstall the terminal block access cover. Hot (Black) Ground Screw Neutral (White) Hot (Red) Power Cord Ground Wire White Wire moved from Ground Screw 5" (12.7 cm) Ground Wire 2. Remove the terminal block access cover on the upper back of the dryer. Install a UL-listed strain relief into the power cord through-hole; then thread the power cable prepared in Step 1 through the strain relief. Terminal Block UL-Listed Strain Relief UL-Listed 4-Wire Power Cord MFL67731056_en_150715.indd 23 2015.7.15 3:38:50 PM

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100

23
ENGLISH
w
WARNING
Connect the power cord to the terminal block.
Connect each power cord wire to the terminal block
screw that has the same colored wire. For example,
connect the black power cord wire to the terminal
block screw with the black wire.
Failure to follow these instructions may result in a
short, overload, fire or death.
Grounding through the neutral conductor is
prohibited for: (1) new branch-circuit installations,
(2) mobile homes, (3) recreational vehicles, and
(4) areas where local codes prohibit grounding
through the neutral conductor.
Four-wire connection for electric dryers: Direct wire
• A 4-wire connection is required for all mobile and
manufactured home installations, as well as all new
construction after January 1, 1996.
• A UL-listed strain relief is required.
1. Remove 5 inches (12.7 cm) of the outer covering from
the wire. Remove 5 inches of insulation from the
ground wire. Cut off approximately 1
1
⁄₂ inches (3.8 cm)
from the other three wires and strip 1 inch (2.5 cm)
insulation from each wire. Bend the ends of the three
shorter wires into a hook shape.
2. Remove the terminal block access cover on the upper
back of the dryer. Install a UL-listed strain relief into
the power cord through-hole; then thread the power
cable prepared in Step 1 through the strain relief.
Ground Wire
5"
(12.7 cm)
1" (2.5 cm)
Connecting Electric Dryers (cont.)
USA only
• Use UL-listed
4-wire #10 AWG-minimum copper
conductor cable.
• Allow at least 5 ft. (1.5 m) length to allow for
removal
and reinstallation of the dryer.
3. Transfer the dryer’s ground wire from behind the
green ground screw to the center screw of the
terminal block. Attach the two hot leads of the power
cable to the outer terminal block screws. Attach the
white neutral wire to the center terminal block screw.
Attach the power cable ground wire to the green
ground screw.
TIGHTEN ALL SCREWS SECURELY
.
Reinstall the terminal block access cover.
UL-Listed
Strain Relief
UL-Listed 4-Wire
Power Cord
Terminal
Block
Hot
(Black)
Power Cord
Ground Wire
Ground
Screw
White Wire
moved from
Ground Screw
Neutral
(White)
Hot
(Red)
INSTALLATION INSTRUCTIONS
MFL67731056_en_150715.indd
23
2015.7.15
3:38:50 PM