LG WG1005R Owner's Manual - Page 14
Preparation of Chassis
View all LG WG1005R manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
Installation Preparation of Chassis 1. Remove the screws which fasten the cabinet at both sides and at the back. Tip! Use a long screwdriver and installing the screws will be easier. Shipping Screws 2. Slide the unit from the cabinet by gripping the base pan handle and pulling forward while bracing the cabinet. 3. Cut the window sash seal to the proper length. Peel off the backing and attach the Foam-Pe to the underside of the window sash. 4. Remove the backing from the top Upper Guide Foam-PE and attach it to the bottom of the Upper Guide Foam-Pe 5. Attach the Upper Guide onto the top of the cabinet with 3 Type A screws. 6. Insert the Frame Guides into the bottom of the cabinet. 7. Insert the Frame Curtain into the Upper Guide and Frame Guides . (Type A) Upper Guide Screw 8. Fasten the curtains to the unit with 4 Type A screws. Screw (Type A) Frame Guides Upper Guide Foam-Pe Frame Screw Guides (Type A) 14 Room Air Conditioner