LiftMaster 1355 1355 Manual - Page 7
Hardware Inventory
View all LiftMaster 1355 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 7 highlights
Hardware Inventory Separate all hardware and group as shown below for the assembly and installation procedures. INSTALLATION HARDWARE Lag Screw 5/16"-9 x1-5/8" (2) Lag Screw 5/16"-18x1-7/8" (2) Hex Bolt 5/16"-18x7/8" (4) NOTICE Handle Self-Threading Screw 1/4"-14x5/8" (2) Drywall Anchors (2) Carriage Bolts 1/4"-20x1/2" (2) Lock Washer 5/16" (4) Rail Grease Nut 5/16"-18 (4) Ring Fastener (3) Rope Wing Nut 1/4"-20 (2) Staples (30) Clevis Pin 5/16"x2-3/4" (1) Clevis Pin 5/16"x1" (1) Clevis Pin 5/16"x1-1/4" (1) 7
7
Hardware Inventory
Separate all hardware and group as shown below for the assembly and installation procedures.
Nu
t 5/16"-1
8
(4)
Cle
v
is Pin
5/16"x2-3/4" (1)
N
OTICE
Handle
Dry
w
all
Anchors (2)
Cle
v
is Pin
5/16"x1" (1)
Cle
v
is Pin
5/16"x1-1/4" (1)
Hex Bolt
5/16"-1
8
x7/
8
" (4)
Rope
Ring Fastener (3)
Lock
W
asher 5/16" (4)
Lag Scre
w
5/16"-9 x1-5/
8
" (2)
W
ing
Nu
t
1/4"-20 (2)
Staples (30)
Rail Grease
Carriage Bolts
1/4"-20x1/2" (2)
Lag Scre
w
5/16"-1
8
x1-7/
8
" (2)
Self-Threading Scre
w
1/4"-14x5/
8
" (2)
INSTALLATION HARDWARE