LiftMaster CSW24V CSW24V Installation Manual - Page 14

Installation - 24

Page 14 highlights

INSTALLATION STANDARD INSTALLATION ONLY STANDARD INSTALLATION ONLY For compact installation start on page 14. DETERMINE LOCATION FOR CONCRETE PAD AND OPERATOR DO NOT run the operator until instructed. Below is a recommended guide for positioning the concrete pad: 1 Measure 1/4 the length of the gate from the gate hinge center. This is A. 2 Subtract 14 inches from A to get B, the distance from the center of the output shaft to the center of the gate hinge. 3 Open the gate 90°. The distance from the gate to the center of the output shaft must be a minimum of 9 inches. CONDUIT LOCATION 5.5" 4.5" 1" 6.5" 4" 1.5" (Conduit) 3" 10" 20" 28" MOUNTING FOOTPRINT 13.6" 12.2" 6.1" 2.49" 14" 15" (Pad) 24" 14.82" (cover mounting distance) TOP VIEW OF OPERATOR AND GATE 1 Gate Hinge 1/4 1/4 1/4 A 2 B 90° minimum of 9" 3 Output Shaft 28" CONCRETE PAD AND OPERATOR ATTACHMENT Check the national and local building codes before installation. NOTE: When lifting the operator use the handle to avoid damaging the operator. 1 Install the electrical conduit. 2 Pour a concrete pad (reinforced concrete is recommended). The concrete pad should be 6 inches above the ground and deeper than the frost line. Ensure the pad is tall enough to avoid possible flooding. 3 Secure the operator to the concrete pad with appropriate fasteners. NOTE: An alternative to a concrete pad is to post mount the operator (refer to accessories). 12 Post Mount 6" Above Ground 2 Below the frost line. Check all national and local codes. 1 28" 24" 3 4 Concrete Anchors 1/2" x 3 1/2" 24"

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

12
INSTALLATION
STANDARD INSTALLATION ONLY
STANDARD INSTALLATION ONLY
For compact installation start on page 14.
DETERMINE LOCATION FOR CONCRETE PAD AND
OPERATOR
DO NOT run the operator until instructed.
Below is a recommended guide for positioning the concrete pad:
1
Measure 1/4 the length of the gate from the gate hinge center. This is A.
2
Subtract 14 inches from A to get B, the distance from the center of the output
shaft to the center of the gate hinge.
3
Open the gate 90°. The distance from the gate to the center of the output
shaft must be a minimum of 9 inches.
CONDUIT LOCATION
MOUNTING FOOTPRINT
5.5”
4.5”
1”
6.5”
4”
1.5”
10”
3”
28”
20”
15”
24”
13.6”
12.2”
6.1”
2.49”
14”
14.82”
(cover mounting distance)
1
1/4
1/4
1/4
A
B
90°
minimum
of 9”
Output Shaft
28”
24”
2
3
TOP VIEW OF OPERATOR AND GATE
Gate Hinge
CONCRETE PAD AND OPERATOR ATTACHMENT
Check the national and local building codes before installation.
NOTE:
When lifting
the operator use the handle to avoid damaging the operator.
1
Install the electrical conduit.
2
Pour a concrete pad (reinforced concrete is recommended). The concrete pad
should be 6 inches above the ground and deeper than the frost line. Ensure
the pad is tall enough to avoid possible flooding.
3
Secure the operator to the concrete pad with appropriate fasteners.
NOTE:
An alternative to a concrete pad is to post mount the operator (refer to
accessories).
4 Concrete Anchors
1/2” x 3 1/2”
Below the frost line.
Check all national
and local codes.
6” Above Ground
28”
24”
1
2
3
Post Mount
(Conduit)
(Pad)