WIRING POWER WIRING CONTINUED... 120 VAC AND 240 VAC 1 Turn off the AC power from the main power source circuit breaker. 2 Run the AC power wires to the operator. 3 Remove the junction box cover. 4 Connect the green wire to the earth ground rod and AC ground using a wire nut. NOTE: The earth ground rod can be grounded to the chassis. 5 Connect the white wire to NEUTRAL using a wire nut. 6 Connect the black wire to HOT using a wire nut. 7 Replace the junction box cover. Ensure the wires are not pinched. Junction Box Cover POWER WIRING SOLAR PANEL(S) NOT PROVIDED. SEE ACCESSORIES. For solar applications DO NOT use the expansion board and the wireless dual gate feature. These features will substantially decrease the cycle rate and standby time of the operator. The solar panel(s) must be located in an open area clear of obstructions and shading for the entire day. The gate operator is not supported in northern climates where temperatures reach below -4˚F. This is due to cold weather and a reduced number of hours of sunlight during the winter months. Cycle rate may vary from solar chart for areas that reach below 32˚F. Solar panels should be cleaned on a regular basis for best performance to ensure proper operation. For solar applications, a minimum of two 10W solar panels in series and two 7AH batteries are recommended. For Zone 3 cold weather sites, two 33AH batteries are recommended. We recommend LiftMaster low power draw accessories to minimize power draw, refer to accessory page. 1 Remove the outlet housing from the chassis by removing the screws (2). 2 Remove the electrical box from the chassis by removing the 4 corner screws. 3 Locate the red and black wires connected to the J15 plug labeled DC POWER on the control board. Unplug the wires from the bridge rectifier located on NUMBER OF CYCLES PER DAY (SOLAR) Swing Gate Installation (12 ft. 800 lb. gate) CONFIGURATION ZONE 1 (6 Hrs sunlight/day) ZONE 2 (4 Hrs Sunlight/day) ZONE 3 (2 Hrs Sunlight/day) the back of the electrical box. Transmitters Wireless Dual Gate 1 Loop (LD7LP) 7AH Batteries (standard) 33AH Batteries (optional) 7AH Batteries (standard) 33AH Batteries (optional) 7AH Batteries (standard) 33AH Batteries (optional) 4 Connect the red (+) wire from the J15 plug to the red wire from the solar panel. 5 Connect the black (-) wire from the J15 plug to the black wire from the solar panel. 6 Reassemble the operator. Black Wire Red Wire Outlet Housing 20W SOLAR PANEL NOTE: 20W would be two 10W (12V) panels in series. ✔ ✔ ✔ 51 66 49 64 ✔ 44 59 ✔ ✔ 40 54 31 39 11 13 30 38 10 12 25 33 5 7 20 28 1 2 40W SOLAR PANEL 90 144 70 92 31 39 NOTE: 40W would be two 20W panels in series. ✔ ✔ ✔ 88 142 69 90 30 38 ✔ 83 137 64 85 25 33 ✔ ✔ 79 132 59 80 20 28 3 NOT AVAILABLE NOT AVAILABLE 2 3 Bridge Rectifier 1 2 1 (back of Electrical Box) J15 Plug 19

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

19
120 VAC AND 240 VAC
POWER WIRING CONTINUED...
POWER WIRING
WIRING
SOLAR PANEL(S)
1
Remove the outlet housing from the chassis by removing the screws (2).
2
Remove the electrical box from the chassis by removing the 4 corner screws.
3
Locate the red and black wires connected to the J15 plug labeled DC POWER
on the control board. Unplug the wires from the bridge rectifier located on
the back of the electrical box.
4
Connect the red (+) wire from the J15 plug to the red wire from the
solar panel.
5
Connect the black (-) wire from the J15 plug to the black wire from the
solar panel.
6
Reassemble the operator.
Junction Box Cover
Red Wire
Black Wire
Bridge Rectifier
J15 Plug
1
Turn off the AC power from the main power source circuit breaker.
2
Run the AC power wires to the operator.
3
Remove the junction box cover.
4
Connect the green wire to the earth ground rod and AC ground using a wire
nut.
NOTE:
The earth ground rod can be grounded to the chassis.
5
Connect the white wire to NEUTRAL using a wire nut.
6
Connect the black wire to HOT using a wire nut.
7
Replace the junction box cover. Ensure the wires are not pinched.
NUMBER OF CYCLES PER DAY (SOLAR)
Swing Gate
Installation (12 ft.
800 lb. gate)
CONFIGURATION
ZONE 1
(6 Hrs
sunlight/day)
ZONE 2
(4 Hrs
Sunlight/day)
ZONE 3
(2 Hrs
Sunlight/day)
Transmitters
Wireless Dual Gate
1 Loop (LD7LP)
7AH Batteries (standard)
33AH Batteries (optional)
7AH Batteries (standard)
33AH Batteries (optional)
7AH Batteries (standard)
33AH Batteries (optional)
20W SOLAR PANEL
NOTE:
20W would be two 10W
(12V) panels in series.
51
66
31
39
11
13
49
64
30
38
10
12
44
59
25
33
5
7
40
54
20
28
1
2
40W SOLAR PANEL
NOTE:
40W would be two 20W
panels in series.
90
144
70
92
31
39
88
142
69
90
30
38
83
137
64
85
25
33
79
132
59
80
20
28
NOT PROVIDED. SEE ACCESSORIES.
For solar applications DO NOT use the expansion board and the wireless dual gate feature. These features will substantially decrease the cycle rate
and standby time of the operator.
The solar panel(s) must be located in an open area clear of obstructions and shading for the entire day. The gate operator is not
supported in northern climates where temperatures reach below -4˚F. This is due to cold weather and a reduced number of hours of sunlight during the winter months. Cycle
rate may vary from solar chart for areas that reach below 32˚F. Solar panels should be cleaned on a regular basis for best performance to ensure proper operation.
For solar
applications, a minimum of two 10W solar panels in series and two 7AH batteries are recommended. For Zone 3 cold weather sites, two 33AH batteries are recommended. We
recommend LiftMaster low power draw accessories to minimize power draw, refer to accessory page.
NOT AVAILABLE
NOT AVAILABLE
1
1
2
3
2
3
(back of Electrical Box)
Outlet Housing