LiftMaster LA500UL Installation Manual - Page 16
Wired Setup, Install a second operator arm, Install the extension cable and junction box
View all LiftMaster LA500UL manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
INSTALLATION Wired Setup Install a second operator arm: Install a second operator arm by following installation steps 1-2. Install the extension cable and junction box: Before digging, contact local underground utility locating companies. 1. Trench across driveway to bury the extension cable. Use PVC conduit to prevent damage to cables. 2. Open the junction box by removing screws (4) and set aside. 3. Select holes to be used for mounting and knock out using a screwdriver and hammer. Drill two holes in the junction box large enough for the watertight connectors. 4. Mount the junction box within 3 feet (0.9 m) of second operator. 5. Route operator cable and extension cable through watertight connector nut and watertight connector. 6. Insert the cables and watertight connectors into the holes in the junction box. 7. Slide the connector nut onto the operator cable and extension cable. 8. Connect the wires from extension cable and operator cable to the terminal block connector as shown (like-colored wires must face each other). 9. Put wires inside of junction box. 10. Secure operator and extension cables by tightening the connector nut. 11. Reinstall cover. 16