Netgear EN108 EN104 Installation Guide - Page 13

Verify Installation, The green Active LED on each connected AUI port is on.

Page 13 highlights

Verify Installation To complete the installation, connect the power cord first to the power receptacle on the hub rear panel and then to the power outlet on the wall. When power has been applied to the hub: • The green Pwr (Power) LED on the front panel is on. • The green Link LED on each connected port is on. • The green Active LED on each connected AUI port is on. • The green Active LED on each connected BNC port is on. If encounter any problems, refer to "Troubleshooting" on page 4. Model EN104/EN108/EN116 Ethernet Hub Installation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19

Model EN104/EN108/EN116 Ethernet Hub Installation Guide
To complete the installation, connect the power cord first to the power receptacle
on the hub rear panel and then to the power outlet on the wall. When power has
been applied to the hub:
The green Pwr (Power) LED on the front panel is on.
The green Link LED on each connected port is on.
The green Active LED on each connected AUI port is on.
The green Active LED on each connected BNC port is on.
If encounter any problems, refer to “Troubleshooting” on page 4.
Verify Installation