Netgear EN108 EN104 Installation Guide - Page 7

Installation Procedures, Prepare the Site, Install the Hub, all around the hub for ventilation. - model #

Page 7 highlights

Installation Procedures Prepare the Site Before you begin installing your hub, prepare the installation site. Make sure your operating environment meets the operating environment requirements of the equipment. Characteristic Temperature Operating humidity Ventilation Operating conditions Service access Power Wiring hardware Requirement Ambient temperature between 0° and 40° C (32° and 104° F). No nearby heat sources such as direct sunlight, warm air exhausts, or heaters. Maximum relative humidity of 90%, noncondensing. Minimum 2 inches (5.08 cm) on all sides for cooling. Adequate airflow in room or wiring closet. At least 6 feet (1.83 m) to nearest source of electromagnetic noise (such as photocopy machine or arc welder). Minimum 12 inches (19.68 cm) front and back for service access and maintenance. Front and back clearance for cables and wiring hardware such as punchdown blocks. Adequate power source within 6 feet (1.83 m). Wiring hardware, such as punchdown blocks or patch panels, should be complete before installing the hub. Install the Hub To install your hub on a flat surface, you do not need any special tools. Be sure the hub is positioned with at least 2 inches of space on all sides for ventilation. To install the hub on a wall, measure the distance between the mounting holes on the back of the hub and mark the wall to match the location of the mounting holes on the hub. At the marked location, screw into the wall the two screws that you received with the mounting kit included in your package contents. Be sure to choose a location that is near the devices to be connected, is close to an electrical outlet, and provides at least 2 inches of space all around the hub for ventilation. Model EN104/EN108/EN116 Ethernet Hub Installation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19

Model EN104/EN108/EN116 Ethernet Hub Installation Guide
Before you begin installing your hub, prepare the installation site. Make sure
your operating environment meets the operating environment requirements of
the equipment.
To install your hub on a flat surface, you do not need any special tools. Be sure the hub is
positioned with at least 2 inches of space on all sides for ventilation.
To install the hub on a wall, measure the distance between the mounting holes on the back of the
hub and mark the wall to match the location of the mounting holes on the hub. At the marked
location, screw into the wall the two screws that you received with the mounting kit included in
your package contents. B
e sure to choose a location that is near the devices to be
connected, is close to an electrical outlet, and provides at least 2 inches of space
all around the hub for ventilation.
Characteristic
Requirement
Temperature
Ambient temperature between 0
°
and 40
°
C (32
°
and 104
°
F).
No nearby heat sources such as direct sunlight, warm air
exhausts, or heaters.
Operating humidity
Maximum relative humidity of 90%, noncondensing.
Ventilation
Minimum 2 inches (5.08 cm) on all sides for cooling.
Adequate airflow in room or wiring closet.
Operating conditions
At least 6 feet (1.83 m) to nearest source of electromagnetic
noise (such as photocopy machine or arc welder).
Service access
Minimum 12 inches (19.68 cm) front and back for service
access and maintenance. Front and back clearance for cables
and wiring hardware such as punchdown blocks.
Power
Adequate power source within 6 feet (1.83 m).
Wiring hardware
Wiring hardware, such as punchdown blocks or patch panels,
should be complete before installing the hub.
Installation Procedures
Prepare the Site
Install the Hub