Panasonic FV11VF2 FV11VH2 User Guide - Page 9

Installation, Wooden Header Installation, Between Joist Mounting Continued

Page 9 highlights

INSTALLATION (BETWEEN JOIST MOUNTING) CONTINUED Fig.13, Fig.14 2 Long screws (ST4.2X20) Joist Fig.13 Fig.14 6. Follow step 5 of installation (page 7) to complete the installation work. 2-Screw 4 Long screws (ST4.2X12) (ST4.2X20) Joist Fig.14 INSTALLATION (WOODEN HEADER INSTALLATION) 1. Before installation, remove warning lable and the tape that is securing the adapter and the damper. (Fig.1) Ceiling joist (Fig.15, Fig.16) 11 3/8 (290) Fan body Header 19 7/8 (505) Ceiling joist Adaptor Fig.15 4. Follow step 5 of installation (page 7) to complete the installation work. Adaptor Circular duct Long screw (ST4.2X20) Fig.16

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12

Fig.15
Fig.16
(Fig.15, Fig.16)
INSTALLATION
(WOODEN HEADER INSTALLATION)
11 3/8 (290)
19 7/8 (505)
Adaptor
Fan body
Ceiling joist
Ceiling joist
Header
Adaptor
Circular
duct
Long screw (ST4.2X20)
4. Follow step 5 of installation
(page 7) to complete the
installation work.
1. Before installation, remove warning lable and the tape
that is securing the adapter and the damper. (Fig.1)
INSTALLATION
(BETWEEN JOIST MOUNTING) CONTINUED
Fig.13, Fig.14
Fig.14
6. Follow step 5 of installation
(page 7) to complete the
installation work.
Fig.13
Fig.14
Joist
2 Long screws
(ST4.2X20)
4 Long screws
(ST4.2X20)
Joist
2-Screw
(ST4.2X12)