Poulan PPCRT17 Owner Manual - Page 6
Connect Shift Rod See Fig. 7, Remove Tiller From Crate, Check Tire Pressure, Handle Height, Insert
View all Poulan PPCRT17 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
ASSEMBLY INSERT CABLE CLIP (See Fig. 6) • Insert plastic cable clip into hole on the back of handle column. Push cables into clip. HANDLE COLUMN CABLE CLIP CABLES Fig. 6 CONNECT SHIFT ROD (See Fig. 7) • Insert end of shift rod farthest from bend into hole of shift lever indicator. • Insert hairpin clip through hole of shift rod to secure with bend of clip on right side. REMOVE TILLER FROM CRATE • Adjust handle assemby to lowest position. Be sure lock lever is tightened securely. • Make sure shift lever indicator is in "N" (neutral) position (See Fig. 7) • Tilt tiller forward by lifting handle. Separate cardboard cover from leveling shield. • Rotate tiller handle to the right and pull tiller out of carton. CHECK TIRE PRESSURE The tires on your unit were overinflated at the factory for shipping purposes. Correct and equal tire pressure is important for best tilling performance. • Make sure tires are properly inflated to the PSI shown on tires. HANDLE HEIGHT • Handle height may be adjusted to better suit operator. (See "TO ADJUST HANDLE HEIGHT" in the Service and Adjustments section of this manual). ATTACH THIS END TO SHIFT LEVER INDICATOR SHIFT ROD HAIRPIN CLIP SHIFT ROD SHIFT LEVER INDICATOR Fig. 7 6