ProForm 300 Cr Bike English Manual - Page 7

four M8 Split Washers 55.

Page 7 highlights

2. While another person lifts the rear of the Frame (1), attach the Rear Stabilizer (16) to the Frame 2 with four M8 x 55mm Patch Screws (52) and four M8 Split Washers (55). 1 16 55 55 52 3. While another person holds the Upright (2) near the Frame (1), locate the wire tie in the Upright. See the inset drawing. Tie the lower end of the wire tie to the Pulse Extension Wire (79) and to the Main Wire Harness (43). Next, pull the other end of the wire tie upward out of the top of the Upright (2). Tip: Do not allow the ends of the wires to fall into the Upright (2). Use the wire tie to hold the wires in place until step 6. Tip: Avoid pinching the wires. Attach the Upright (2) to the Frame (1) with an M10 x 63mm Bolt Set (62). 3 43 79 2 Wire Tie 43 79 62 1 62 Avoid pinching the wires 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

7
2.
While another person lifts the rear of the Frame
(1), attach the Rear Stabilizer (16) to the Frame
with four M8 x 55mm Patch Screws (52) and
four M8 Split Washers (55).
2
55
55
16
52
1
3
2
Avoid pinching
the wires
1
3.
While another person holds the Upright (2) near
the Frame (1), locate the wire tie in the Upright.
See the inset drawing.
Tie the lower end of
the wire tie to the Pulse Extension Wire (79)
and to the Main Wire Harness (43). Next, pull
the other end of the wire tie upward out of the
top of the Upright (2).
Tip: Do not allow the ends of the wires to fall
into the Upright (2). Use the wire tie to hold
the wires in place until step 6.
Tip: Avoid pinching the wires.
Attach the
Upright (2) to the Frame (1) with an M10 x
63mm Bolt Set (62).
62
43
62
43
79
79
Wire Tie