Reebok 825 English Manual - Page 10

Put the remaining Pulley, Cable Trap, Jamnut

Page 10 highlights

11. Wrap the High Cable (73) around a 4Ó Pulley (35). 11 Attach the Pulley to the Main Upright (3) with a 3/8Ó x 2 1/2Ó Bolt (54), two 3/8Ó Flat Washers (55), two Pulley Bushings (42) and a 3/8Ó Nylon Jamnut (63). 73 35 42 55 54 12. Dis-assemble the pre-assembled Pulley Plates (31). Note that on one end, the Pulley Plates have several adjustment holes. These holes must be closest to the floor. Wrap the High Cable (73) around a 4Ó Pulley (35). Attach the Pulley to the upper end of the Pulley Plates (31) with a 3/8Ó x 1 3/4Ó Bolt (60), a Cable Trap (44) and a 3/8Ó Nylon Jamnut (63). Make sure the Cable is in the groove of the Pulley and that the Cable Trap is oriented as shown, so it will hold the Cable in place. Put the remaining Pulley, Cable Trap, Jamnut and Bolt aside. They will be used in step 16. 63 42 55 3 12 60 31 35 44 31 73 63 Adjustment Holes 13. Feed the bolt on the High Cable (73) through slot A in the Top Frame (1) from below. Attach a 4Ó Pulley (35) to the Top Frame (1) inside slot A with a 3/8Ó x 2 1/2Ó Bolt (54), two 3/8Ó Flat Washers (55), two Pulley Bushings (42) and a 3/8Ó Nylon Jamnut (63). Fold the High Cable (73) over the 4Ó Pulley (35) you just installed. Feed the bolt on the High Cable through slot B in the Top Frame (1) from above. Wrap the High Cable (73) around a 4Ó Pulley (35). Attach the Pulley to the Top Frame (1) inside slot B with a 3/8Ó x 2 1/2Ó Bolt (54), two 3/8Ó Flat Washers (55), two Pulley Bushings (42) and a 3/8Ó Nylon Jamnut (63). Thread the bolt on the High Cable (73) a couple of turns into the top of the Weight Tube (36) as shown in the inset drawing. 13 63 42 35 55 42 63 Slot B 1 73 55 42 55 Bolt 73 35 Slot A 42 55 54 54 36 10

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25

10
12.
Dis-assemble the pre-assembled Pulley Plates (31).
Note that on one end, the Pulley Plates have several
adjustment holes. These holes must be closest to the
floor.
Wrap the High Cable (73) around a 4± Pulley (35).
Attach the Pulley to the upper end of the Pulley
Plates (31) with a 3/8± x 1 3/4± Bolt (60), a Cable Trap
(44) and a 3/8± Nylon Jamnut (63).
Make sure the
Cable is in the groove of the Pulley and that the
Cable Trap is oriented as shown, so it will hold
the Cable in place.
Put the remaining Pulley, Cable Trap, Jamnut and
Bolt aside. They will be used in step 16.
12
73
60
31
44
35
31
63
Adjustment
Holes
13.
Feed the bolt on the High Cable (73) through slot A in
the Top Frame (1) from below.
Attach a 4± Pulley (35) to the Top Frame (1) inside
slot A with a 3/8± x 2 1/2± Bolt (54), two 3/8± Flat
Washers (55), two Pulley Bushings (42) and a 3/8±
Nylon Jamnut (63).
Fold the High Cable (73) over the 4± Pulley (35) you
just installed. Feed the bolt on the High Cable
through slot B in the Top Frame (1) from above.
Wrap the High Cable (73) around a 4± Pulley (35).
Attach the Pulley to the Top Frame (1) inside slot B
with a 3/8± x 2 1/2± Bolt (54), two 3/8± Flat Washers
(55), two Pulley Bushings (42) and a 3/8± Nylon
Jamnut (63).
Thread the bolt on the High Cable (73) a couple of
turns into the top of the Weight Tube (36) as shown in
the inset drawing.
13
1
42
55
35
35
42
55
54
63
42
63
73
42
55
54
55
Bolt
Slot B
Slot A
11.
Wrap the High Cable (73) around a 4± Pulley (35).
Attach the Pulley to the Main Upright (3) with a 3/8± x
2 1/2± Bolt (54), two 3/8± Flat Washers (55), two
Pulley Bushings (42) and a 3/8± Nylon Jamnut (63).
11
55
42
63
3
35
42
55
54
73
73
36